The Observational Method was successfully used for the construction of a road cutting in Glacial Till in north London. Better and more appropriate soil parameters were derived by back-analysing neighbouring excavations. Use of the method allowed construction to take place in an open cut supported by berms instead of beneath raking props. Monitoring showed that movements remained in the green zone and there was no need to implement any of the planned contingencies. The overall savings were about 5% on cost and at least 18% on programme with a marked reduction in the materials and plant used, giving added environmental benefits.

  • Introduction

  • Ground Conditions

  • Planned and actual Construction Sequences

  • Soil Design Parameters for Observational Method Design

  • Implementation of Observational Method

  • Application and Results

  • Discussion

  • Conclusions

  • Acknowledgements

  • References

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.