Open figure viewer
Describes the background to – and some of the design issues raised by – the BT Redeployment Development Centre project. Both the ethical considerations of shared feedback and benefits to the participants are examined in a change management context. Highlights some possible pitfalls for potential designers of such events.
This content is only available via PDF.
© MCB UP Limited
1992
You do not currently have access to this content.
