This is the first part of a two‐part paper dealing with the structural design and construction monitoring aspects of façade retention projects in town and city centres. The subject matter covered includes the initial research, detailed surveys, and preliminary design assessments that are necessary to arrive at the preferred method of construction to be adopted for new buildings behind the façade and/or other external walls of existing buildings which are to be substantially demolished. The second part of this paper, which will be published at a later date, will cover detailed structural design and specification aspects, tender invitations and appraisals and the demolition and construction monitoring necessary to ensure façade stability is maintained at all stages.
Article navigation
Review Article|
January 01 1985
Façade retention projects — 1
W.F. Hill
W.F. Hill
Chief Examiner for the Institution of Structural Engineers
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6844
Print ISSN: 0263-080X
© MCB UP Limited
1985
Structural Survey (1985) 3 (1): 12–23.
Citation
Hill W (1985), "Façade retention projects — 1". Structural Survey, Vol. 3 No. 1 pp. 12–23, doi: https://doi.org/10.1108/eb006201
Download citation file:
446
Views
Suggested Reading
Façade retention projects — 2
Structural Survey (March,1985)
Façading
Structural Survey (January,1990)
Psychological contract breach, façade creation and family satisfaction: the role of diverse emotion
Management Decision (March,2025)
Building facade failures
Proceedings of the Institution of Civil Engineers - Forensic Engineering (February,2012)
The FIX-up mix-up; undue façadism or adaptive reuse? Examining the former FIX brewery transformation into the National Museum of Contemporary Art in Athens
Archnet-IJAR: International Journal of Architectural Research (May,2022)
Related Chapters
Temporary façade retention
Temporary Works: Principles of Design and Construction
Building Facade Failures
Forensic engineering: From failure to understanding: Proceedings of the two day international conference organised by the Institution of Civil Engineers and held in London on 2 to 4 December 2008
Temporary façade retention
Temporary Works: Principles of design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.