Presents a new approach to working set generation for personnel scheduling problems. In full‐time (FT) and mixed‐workforce (MW)experiments, generates the schedules in the working sets from the use of two‐phase heuristic labour scheduling solution procedures. The solution procedures were implemented on a 386 microcomputer and did not require the specification of the size of the working sets in advance. In the FT experiment, the general set‐covering formulations (GSCFs) associated with the produced working sets were solved with integer programming. The new working set procedure yielded optimal integer solutions for all 36 test problems in the FT experiment. Owing to the size and complexity of the problem data in the MW experiment, the GSCFs associated with the working sets were solved with linear programming, and heuristic rounding procedures were applied to obtain feasible integer solutions. The mean labour costs of these solutions averaged 0.69 per cent less than the mean cost of solutions obtained via the application of heuristic rounding procedures applied to the linear programme solutions for the GSCFs associated with the master sets. Compares solution costs for the new working set method with those associated with other working set generation/refinement procedures. Results indicate that the new method produces lower solution costs in less control processing unit time.
Article navigation
1 October 1995
Research Article|
October 01 1995
Microcomputer‐based working set generation methods for personnel scheduling Available to Purchase
Stephen E. Bechtold;
Stephen E. Bechtold
Department of Information and Management Sciences, Florida State University, Tallahassee, Florida, USA
Search for other works by this author on:
Michael J. Brusco
Michael J. Brusco
Department of Information and Management Sciences, Florida State University, Tallahassee, Florida, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6593
Print ISSN: 0144-3577
© MCB UP Limited
1995
International Journal of Operations & Production Management (1995) 15 (10): 63–74.
Citation
Bechtold SE, Brusco MJ (1995), "Microcomputer‐based working set generation methods for personnel scheduling". International Journal of Operations & Production Management, Vol. 15 No. 10 pp. 63–74, doi: https://doi.org/10.1108/01443579510098329
Download citation file:
Suggested Reading
Preemptive scheduling with transportation delays between machines
Journal of Modelling in Management (January,2020)
The effect of demand characteristics on labour scheduling methods
International Journal of Operations & Production Management (January,1995)
A Very Fast Production Scheduler
International Journal of Operations & Production Management (August,1994)
A Deterministic Maintenance‐scheduling Problem for a Group of Non‐identical Machines
International Journal of Operations & Production Management (July,1994)
Microcomputer‐based Workforce Scheduling
International Journal of Service Industry Management (March,1993)
Related Chapters
Reducing Bias in Hierarchical Forecasting
Advances in Business and Management Forecasting
Bounded Rationality, Heuristics, Computational Complexity, and Artificial Intelligence
Behavioral Strategy in Perspective
Business Modelling as Configuring Heuristics
Business Models and Modelling
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.