Open figure viewer
Explains the reasons behind, and the methodology of, a project to introduce a systematic work measurement programme based on standard data to a particular set of operations at the Rank Xerox Mitcheldean site. Points out both the successes and failings of the resultant scheme.
© MCB UP Limited
1997
You do not currently have access to this content.
