Open figure viewer
How one company has tackled the implementation of a quality system using BS5750 Part 2 as its guide is described. The setting of objectives, activating cultural change, planning, implementation, control and continuous review are addressed with examples drawn from experience gained during the project.
This content is only available via PDF.
© MCB UP Limited
1991
You do not currently have access to this content.
