Acceptance sampling can be both time‐consuming and destructive so that it is desirable to arrive at a sound lot disposition decision in a timely manner. Sequential sampling plans are attractive since they offer a lower average sample number than do matched single, double, or multiple sampling plans. Analogously, cumulative sum control charts offer the ability to detect moderate process shifts more rapidly than do Shewhart control charts applied to the same process. The inverse Gaussian distribution is flexible and is often the model of choice in accelerated life testing applications where early failure times predominate. Based on sequential probability ratio tests (SPRT), sequential sampling/ cumulative sum (CUSUM) plans provide timely, statistically based decisions. Presents SPRT and CUSUM results for the inverse Gaussian process mean. Also presents a simple goodness‐of‐fit test for the inverse Gaussian distribution which allows for model adequacy checking.
Article navigation
1 August 1997
Research Article|
August 01 1997
Sequential analysis of an accelerated life model
Rick L. Edgeman;
Rick L. Edgeman
Colorado State University, Fort Collins, Colorado, USA
Search for other works by this author on:
Dennis K.J. Lin
Dennis K.J. Lin
Pennsylvania State University, University Park, Pennsylvania, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6682
Print ISSN: 0265-671X
© MCB UP Limited
1997
International Journal of Quality & Reliability Management (1997) 14 (6): 598–605.
Citation
Edgeman RL, Lin DK (1997), "Sequential analysis of an accelerated life model". International Journal of Quality & Reliability Management, Vol. 14 No. 6 pp. 598–605, doi: https://doi.org/10.1108/02656719710186218
Download citation file:
New and popular articles
Suggested Reading
A new approach to monitor the process dispersion
International Journal of Quality & Reliability Management (March,2011)
Cusum modelling of the dynamics of process performance improvement programmes
International Journal of Productivity and Performance Management (February,2006)
A new CUSUM‐S2 control chart for monitoring the process variance
Journal of Quality in Maintenance Engineering (September,2009)
An optimization‐based framework for designing acceptance sampling plans by variables for non‐conforming proportions
International Journal of Quality & Reliability Management (August,2010)
Quality control and social processes: a case for acceptance sampling
Benchmarking for Quality Management & Technology (June,1996)
Related Chapters
Paradox? What Paradox? On a Brief Correspondence Between Leonard Savage and Karl Popper
Research in the History of Economic Thought and Methodology: Including a Symposium on Sir James Steuart: The Political Economy of Money and Trade
Paradox and Quantum Mechanics: Implications for the Management of Organizational Paradox from a Quantum Approach
Interdisciplinary Dialogues on Organizational Paradox: Learning from Belief and Science, Part A
The Fuzzy Analytic Hierarchy Process in the Investment Appraisal of Drilling Methods
Fuzzy Hybrid Computing in Construction Engineering and Management: Theory and Applications
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
