The subject of investigation reported in this paper is the determination of an optimal replacement time for equipment that deteriorates with time. The following hypothesis is proposed and investigated. While a piece of equipment is in the final stages of its life span, i.e. the wear‐out phase, the application of preventive replacement strategy at constant time intervals reduces total down‐time. The novelty of the approach used in this research lies in the conversion of the more complicated classical constant‐interval replacement model to a simplified but nonetheless effective model. Results are shown for a case where the equipment time‐to‐failure has a normal distribution. These results also hold for a Weibull distribution with known shape and scale parameters. The simplified methods proposed in this paper can assist maintenance managers to better make economic decisions about equipment maintenance.
Article navigation
1 November 2000
Research Article|
November 01 2000
The constant‐interval replacement model for preventive maintenance: A new perspective
K.B Bahrami‐G.;
K.B Bahrami‐G.
Monash University, Melbourne, Victoria, Australia
Search for other works by this author on:
J.W.H. Price;
J.W.H. Price
Monash University, Melbourne, Victoria, Australia
Search for other works by this author on:
J. Mathew
J. Mathew
Monash University, Melbourne, Victoria, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6682
Print ISSN: 0265-671X
© MCB UP Limited
2000
International Journal of Quality & Reliability Management (2000) 17 (8): 822–838.
Citation
Bahrami‐G. K, Price J, Mathew J (2000), "The constant‐interval replacement model for preventive maintenance: A new perspective". International Journal of Quality & Reliability Management, Vol. 17 No. 8 pp. 822–838, doi: https://doi.org/10.1108/02656710010317047
Download citation file:
New and popular articles
Suggested Reading
Trend testing in reliability engineering
International Journal of Quality & Reliability Management (March,1996)
A case study on maintenance of bus engines using the sequential method
International Journal of Quality & Reliability Management (March,2003)
Determining replacement policies for bus engines
International Journal of Quality & Reliability Management (October,2000)
Trend testing for complex repairable systems
International Journal of Quality & Reliability Management (August,1996)
On an imperfect preventive maintenance model
International Journal of Quality & Reliability Management (August,2000)
Related Chapters
Application of risk and reliability to the management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Construct Measurement in Strategic Management Research in Africa
Advancing Research Methodology in the African Context: Techniques, Methods, and Designs
APPLICATION OF RELIABILITY THEORY IN SERVICE LIFE PREDICTION OF INITIATION TIME
Challenges of Concrete Construction: Volume 3, Repair, Rejuvenation and Enhancement of Concrete: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 5–6 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
