Skip to Main Content
Article navigation
Purpose

The purpose of this paper is to re‐evaluate the performance of the adaptive control charts which allow some of their design parameters to change during production depending on the collected information from samples over time. Instead of employing a single performance measure (average time to signal process changes), a set of measures, associated with the inspection efficiency and effort, is taken into account in the evaluation process.

Design/methodology/approach

A multivariate analysis of variation (MANOVA) approach along with the post hoc analysis are applied to investigate the performance of different adaptive control charts based on different measures.

Findings

The findings indicate that different adaptive control charts may have different performance, depending on the measure regarded and the value of shift in process mean. In general, the VSSC, VSSI, and VSI control charts would be recommended for a process with a small, moderate, and large shift, respectively. The SS chart is still the best choice for a process with an extremely large shift.

Research limitations/implications

Up to now, the proposed procedure has been developed for the comparative analyses of adaptive charts, but it could be adjusted for other adaptive charts as well.

Originality/value

This paper provides a review of the performance of adaptive control charts from a novel perspective.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal