Skip to Main Content
Article navigation

Presents two production models for maintaining current control of an industrial process under the surveillance of an np‐control chart. The first model assumes that the process is not allowed to continue in operation during the search for the assignable cause. The second assumes that the process is allowed to continue in operation during the search for the assignable cause. Develops two simple algorithms, which are implementable in real time on a personal computer, to get the optimum designs of np‐charts. Twenty‐six numerical examples show that the algorithms are very accurate and efficient.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal