Open figure viewer
A measure of the performance of an operation at a plant is the plant labour productivity index. Deviations in this index often precede changes in the end product delivery time, and the overall company profitability. In this research, uses the M‐type Iterative Procedure and a level shift routine to model this index in terms of ARIMA (p,d,q) process, and to locate outliers and level shifts. These deviations help in identifying changes in this productivity index.
This content is only available via PDF.
© MCB UP Limited
1993
You do not currently have access to this content.
