Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Risk priority number
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Ammar Chakhrit, Nour El Houda Benharkat, Islam Hadj Mohamed Guetarni, Abdelmoumene Guedri, Mohammed Chennoufi
International Journal of Quality & Reliability Management (2025) 42 (9): 2415–2454.
Published: 22 April 2025
.... The study addresses the limitations of the traditional risk priority number (RPN) method and identifies gaps in the existing literature. Design/methodology/approach A systematic review was conducted on a wide range of studies published between 2004 and 2024. The reviewed papers were categorized based...
Includes: Supplementary data
Journal Articles
International Journal of Quality & Reliability Management (2020) 37 (6-7): 939–956.
Published: 24 April 2020
.... Thus, fuzzy TODIM was employed to calculate the ranking of potential failure modes according to their risk priority numbers (RPNs). In order to verify the results of the study, in-depth interviews were conducted with the participation of industry experts. Findings The results are very much in line...
Journal Articles
International Journal of Quality & Reliability Management (2014) 31 (5): 601–614.
Published: 29 April 2014
...Debasis Das Adhikary; Goutam Kumar Bose; Dipankar Bose; Souren Mitra Purpose – The purpose of this paper is to present a multi criterion failure mode effect and criticality analysis for coal-fired thermal power plants using uncertain data as well as substituting the traditional risk priority...
