Project monitoring is one of the important activities in the management of a project and its main objective is to supply the necessary information for proper control of the project based on the project plan. Monitoring of a project covers different issues related to costs, resources, problems, progress etc. All these issues are dependent on many other sub‐issues and any changes in any of them influences the whole project monitoring system. EArned value analysis is one of the tools used for monitoring the progress and costs of the project is composed of several factors. In the present work, the activity of project monitoring has been treated as a general system and earned value analysis as a specific system for modeling and simulating the dynamics involved therein. System dynamics methodology has been applied for this purpose. A case study has been conducted on a real‐world software project in an IT organization. The results show that the system of earned value analysis is highly influenced by the variations in the estimated cost of unit effort, delay in an activity and estimated effort of work package.
Article navigation
1 January 2006
Research Article|
January 01 2006
Modeling and simulating the dynamics in project monitoring and earned value analysis Available to Purchase
Nasina Jigeesh;
Nasina Jigeesh
Faculty of information Technology, The ICFAI Business School, Banjara Hills, Hyderabad 500034
Search for other works by this author on:
M.S. Bhat
M.S. Bhat
School of Management Studies, Jawaharlal Nehru Technological University, Hyderabad 500072
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2049-3207
Print ISSN: 0972-7981
© Emerald Group Publishing Limited
2006
Journal of Advances in Management Research (2006) 3 (1): 26–43.
Citation
Jigeesh N, Bhat M (2006), "Modeling and simulating the dynamics in project monitoring and earned value analysis". Journal of Advances in Management Research, Vol. 3 No. 1 pp. 26–43, doi: https://doi.org/10.1108/97279810680001237
Download citation file:
Suggested Reading
System dynamics modeling of design and build construction projects
Construction Innovation: Information Process Management (December,2002)
The impact of customer knowledge on the organizational performance: a system dynamics approach
Kybernetes (December,2021)
Precast workflow productivity measurement through BIM adoption
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2016)
Adoption of knowledge management by Canadian housing charities
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (April,2015)
Implementing campus‐wide voice over Internet protocol (VoIP) phone systems at small colleges
Campus-Wide Information Systems (December,2002)
Related Chapters
Chapter 4 Tourism transport, technology, and carbon dioxide emissions
Tourism and the Implications of Climate Change: Issues and Actions
Analysing Smart Tourism Ecosystems for Sustainable Development: A System Dynamics Approach
Shaping Collaborative Ecosystems for Tomorrow
The Role of Operations in a Mega Project
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
