The existing Forth Road Bridge spans the Firth of Forth in Scotland. The main suspension bridge, with central span of 1006 m, has two multi-span approach viaducts leading up to the main crossing. The deck of the approach viaducts comprises a pair of longitudinal steel box girders supporting a series of transversely spanning steel girders, both acting compositely with a reinforced concrete deck. The steel girders of the approach viaducts are supported on steel roller and rocker bearings on concrete portal piers which vary in height between 11 m and 40 m. An initial study of the bearings identified that the rollers had locked up due to corrosion and distortion, and the concrete beneath the bearings and elsewhere on the pier tops had deteriorated due to chloride contamination. Assessment showed that structural deficiencies in the pier were exacerbated by both the concrete deterioration and change in articulation. These factors led to the decision to replace all the bearings on the viaducts. This paper outlines the design of the strengthening and modifications to the bridge to facilitate bearing replacement, together with a detailed description of the design of the temporary works needed to maintain the bridge's articulation during jacking.
Article navigation
September 2014
Research Article|
August 22 2013
Bearing replacements for Forth Road Bridge approach viaducts
Barry Colford, BSc (Hons), CEng, MICE;
Barry Colford, BSc (Hons), CEng, MICE
Chief Engineer, Forth Road Bridge
Search for other works by this author on:
Manuela Chiarello, MEng, PhD, CEng, MICE;
Manuela Chiarello, MEng, PhD, CEng, MICE
Engineer, Special Structures, Atkins Highways and Transportation, Epsom, UK
Search for other works by this author on:
Chris R. Hendy, MA (Cantab), CEng, FICE;
Chris R. Hendy, MA (Cantab), CEng, FICE
Head of Bridge Design and Technology, Atkins Highways and Transportation, Epsom, UK
Search for other works by this author on:
Homayoon Pouya, MSc, PhD, MICorr;
Homayoon Pouya, MSc, PhD, MICorr
Materials Engineer, Structural Rehabilitation, Atkins Highways and Transportation, Epsom, UK
Search for other works by this author on:
Jessica Sandberg, BE, CEng, MICE;
Jessica Sandberg, BE, CEng, MICE
Senior Engineer, Special Structures, Atkins Highways and Transportation, Epsom, UK
Search for other works by this author on:
Paul Smout, BEng, CEng, MIStructE
Paul Smout, BEng, CEng, MIStructE
Engineer, Special Structures, Atkins Highways and Transportation, Epsom, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
November 11 2011
Accepted:
May 11 2012
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2014) 167 (3): 170–182.
Article history
Received:
November 11 2011
Accepted:
May 11 2012
Citation
Colford B, Chiarello M, Hendy CR, Pouya H, Sandberg J, Smout P (2014), "Bearing replacements for Forth Road Bridge approach viaducts". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 167 No. 3 pp. 170–182, doi: https://doi.org/10.1680/bren.11.00051
Download citation file:
New and popular articles
Suggested Reading
Pre-deflecting a steel platform to support a new organ at Manchester Cathedral, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2021)
Fábrica do Paleão: structural assessment of iron in Portugal’s industrial heritage
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (August,2018)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Civil Engineering Innovation (January,2008)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Related Chapters
Nonprofit Social Responsibility and Sustainability: Engaging Urban Youth through Empowerment
Corporate Social Responsibility, Sustainability, and Ethical Public Relations: Strengthening Synergies with Human Resources
The Status of Conservation of Mangroves in the Krueng Reuleng River Area, Leupung, Aceh Besar Regency, Indonesia
Proceedings of MICoMS 2017
Driving the Great Apes to Extinction: Perspectives from Conservation Biology, Politics, and Bioethics
Biopolicy: The Life Sciences and Public Policy
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
