The £1·34 billion Queensferry Crossing over the Firth of Forth in Scotland opened to traffic in 2017. As reported in the authors’ 2016 paper in this journal, three design-and-build contracts for the works were awarded in 2011 varying in size from £13 million to £790 million, all under the original project estimates. The crossing opened within 10 weeks of the contract programme and £250 million under budget despite adverse weather conditions. This paper, published in two parts, covers the construction period and the challenges overcome in delivering the largest Scottish infrastructure project in a generation. This second part covers the approach viaducts and roads; structural health monitoring system; deck finishing works; community engagement and benefits; outturn cost and programme; and the opening.
Article navigation
1 August 2019
Research Article|
December 18 2018
Construction of the Queensferry Crossing and approach roads in Scotland (part 2)
David Climie, OBE, BSc, CEng, FICE;
Transport Scotland, Rosyth, UK
(corresponding author: daveclimie@yahoo.com)
Search for other works by this author on:
Lawrence Shackman, BSc, CEng, FICE, FCIHT
Lawrence Shackman, BSc, CEng, FICE, FCIHT
Project Manager
Transport Scotland, Rosyth, UK
Search for other works by this author on:
(corresponding author: daveclimie@yahoo.com)
Publisher: Emerald Publishing
Received:
October 29 2018
Accepted:
November 02 2018
Online ISSN: 1751-7672
Print ISSN: 0965-089X
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Civil Engineering (2019) 172 (3): 121–129.
Article history
Received:
October 29 2018
Accepted:
November 02 2018
Citation
Climie D, Shackman L (2019), "Construction of the Queensferry Crossing and approach roads in Scotland (part 2)". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 172 No. 3 pp. 121–129, doi: https://doi.org/10.1680/jcien.18.00047
Download citation file:
New and popular articles
Suggested Reading
Construction of the Queensferry Crossing and approach roads in Scotland (part 1).
Proceedings of the Institution of Civil Engineers - Civil Engineering (December,2018)
Design and construction of the A4232 Eastern Bay link phase 1, Cardiff, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2019)
Near-fault vertical ground motion effects on the response of balanced cantilever bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (October,2019)
A spatial view of the flow of force in masonry bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (November,2012)
Design and construction of A34 Wolvercote highway viaduct replacement, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (May,2013)
Related Chapters
Shenzhen Western Corridor
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
FAST TRACK DESIGN AND CONSTRUCTION OF CONCRETE BRIDGES
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Boston Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.