A 33 km long sea dike has been constructed in the Saemangeum coastal waters in the mid-west area of South Korea. The project, which reclaims a surface area of 40 100 ha, includes well-developed tidal flats, two estuaries of the Mankyeong and Dongjin rivers, and a chain of small islands in the outer area off the dike. Three open gaps in the project needed to be closed off. The northern opening of the dike was closed on 10 June 2003, whereas the other two 2·7 km gaps were simultaneously closed on 21 April 2006. A method of combined vertical and horizontal closure was successfully applied to block off the gaps. The method was a conventional scheme that consisted of gradually raising the sill level over the full length of the openings and subsequently dumping rocks and gabions transported by trucks. The use of a bag-type gabion mixture with rocks contributed significantly to the successful completion of the final closure despite the very strong currents.
Article navigation
December 2010
Research Article|
December 01 2010
Final closure of the Saemangeum tidal dike, South Korea Available to Purchase
J. W. Ha, BSc;
J. W. Ha, BSc
1
Field Project Manager
Hyundai E&C Co., Saemangeum Project, Seoul, South Korea
Search for other works by this author on:
D. Eo, MSc;
D. Eo, MSc
2
Principal Researcher
Korea Rural Community Corporation, Seoul, South Korea
Search for other works by this author on:
K. O. Kim, MSc, DEng;
K. O. Kim, MSc, DEng
3
Senior Researcher, Korea Ocean Research & Development Institute, Ansan, South Korea
Search for other works by this author on:
B. H. Choi, MOcE, PhD, CEng, MICE
B. H. Choi, MOcE, PhD, CEng, MICE
4
Professor, Sungkyunkwan University, Suwon, South Korea
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 06 2009
Accepted:
September 10 2010
Online ISSN: 1751-7737
Print ISSN: 1741-7597
© 2010 The authors and the Institution of Civil Engineers
2010
Maritime Engineering (2010) 163 (4): 147–156.
Article history
Received:
July 06 2009
Accepted:
September 10 2010
Citation
Ha JW, Eo D, Kim KO, Choi BH (2010), "Final closure of the Saemangeum tidal dike, South Korea". Maritime Engineering, Vol. 163 No. 4 pp. 147–156, doi: https://doi.org/10.1680/maen.2010.163.4.147
Download citation file:
Suggested Reading
Initial motion of streambeds composed of coarse uniform sediments
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (December,2000)
Minimising dredging for seawall construction in Hong Kong
Maritime Engineering (September,2004)
Extension to the port of Gijón, Spain
Maritime Engineering (December,2008)
Briefing: Dunwich coastal protection demonstration project
Maritime Engineering (December,2010)
Neural network architectures and overtopping predictions
Maritime Engineering (September,2005)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.