‘Work structuring’ refers to the design of the project organisation and includes how the work is divided into work packages and how the work packages are assigned to different subcontractors. Work structuring determines the scope and complexity of each work package as well as the dependencies between work packages and the need for coordination between the project participants assigned the different work packages. This study investigates the work structuring criteria that project managers use to decide the breakdown of the project scope in work packages. Data were collected on three projects through interviews with project managers and review of project records. The findings identify two major sets of factors influencing the work structuring: (1) commercial considerations, including the owner’s requirements and criteria such as budget pressures; requirements for use of local, disadvantaged and minority contractors; prequalification requirements; and licensing. (2) Production considerations including design factors, the difficulty and complexity of the work, interfaces and coordination requirements, the quality of the subcontractors who will be attracted by the work packages and potential production problems. These factors often create conflicting requirements and trade-offs that can affect project performance.
Article navigation
1 June 2016
Research Article|
February 16 2016
Criteria and considerations for project work structuring
Panagiotis Mitropoulos, PhD, PE;
Panagiotis Mitropoulos, PhD, PE
Associate Professor
Civil, Construction and Environmental Engineering Department, San Diego State University, San Diego, CA, USA
Search for other works by this author on:
Ricardo Sanchez, BEng
Ricardo Sanchez, BEng
Resident Engineer
Field Engineering Division, City of San Diego, CA, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 15 2015
Accepted:
July 28 2015
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2016) 169 (3): 124–130.
Article history
Received:
May 15 2015
Accepted:
July 28 2015
Citation
Mitropoulos P, Sanchez R (2016), "Criteria and considerations for project work structuring". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 169 No. 3 pp. 124–130, doi: https://doi.org/10.1680/jmapl.15.00020
Download citation file:
New and popular articles
Suggested Reading
A cognitive approach to trust management in construction
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (October,2013)
Construction project delivery cloud decision-support model
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (March,2017)
Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2018)
Comparison of two infrastructure project implementation models in a developing country
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (February,2018)
Hong Kong’s first public sector NEC contract: lessons learnt
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (September,2016)
Related Chapters
Early Contractor Involvement Models: Their Pros and Cons and When to Use Them
Early Contractor Involvement: Improving the Management of Contract Risk
Public Procurement Process
Early Contractor Involvement: Improving the Management of Contract Risk
Managing Costs Escalation on a Cost Reimbursable Contract
Early Contractor Involvement: Improving the Management of Contract Risk
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.