Develops the joint economic designs of • and S2 control charts under four operating policies to monitor the process in a situation where the occurrence of the assignable cause follows a general distribution with an increasing hazard rate. The four operating policies can be chosen by quality controllers to cope with the specific process situation. Policy I and policy II assume that the process performs the preventive maintenance programme at equal and decreasing sampling time intervals, respectively. Policy III and policy IV in turn merely take samples using the non‐uniform and uniform sampling interval schemes without preventive maintenance. The derivation of the four models is not very difficult, so it can be used to derive another model. Offers numerical examples to compare the economic designs and the total expected costs per hour of the four models. Finds, from the computational results, policy II is the best for adoption in the design of • and S2 control charts. The results also show that the proposed solution procedure is more accurate and better than Rahim et al.’s and Chung and Chen’s procedures. Concludes with remarks and some advantages of introducing the periodic preventive maintenance policy into a process.
Article navigation
1 December 1995
Research Article|
December 01 1995
The economic design of • and S2 control charts with preventive maintenance and increasing hazard rate
Huan‐Neng Chiu;
Huan‐Neng Chiu
National Taiwan Institute of Technology, Taiwan, Republic of China
Search for other works by this author on:
Bo‐Shi Huang
Bo‐Shi Huang
National Taiwan Institute of Technology, Taiwan, Republic of China
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7832
Print ISSN: 1355-2511
© MCB UP Limited
1995
Journal of Quality in Maintenance Engineering (1995) 1 (4): 17–40.
Citation
Chiu H, Huang B (1995), "The economic design of • and S2 control charts with preventive maintenance and increasing hazard rate". Journal of Quality in Maintenance Engineering, Vol. 1 No. 4 pp. 17–40, doi: https://doi.org/10.1108/13552519510105188
Download citation file:
New and popular articles
Suggested Reading
Statistical‐based or condition‐based preventive maintenance?
Journal of Quality in Maintenance Engineering (March,1995)
A strategic methodology to the use of advanced statistical quality improvement techniques
The TQM Magazine (June,1998)
Feasibility study of using statistical process control to optimize quality assurance in radiotherapy
Journal of Quality in Maintenance Engineering (September,2009)
Statistical Quality Control in Retail Banking
International Journal of Bank Marketing (February,1991)
A framework for implementation of statistical process control
International Journal of Quality Science (September,1997)
Related Chapters
APPLICATION OF QUALITY CONTROL CONCEPTS IN CONSTRUCTION ENGINEERING WORKS BY SUGGESTING ROOFING SYSTEM FOR BUILDING PROJECTS IN IRAQ
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
A QUALITY CONTROL SYSTEM FOR READY MIXED CONCRETE IN SAUDI ARABIA
Challenges of Concrete Construction: Volume 6, Concrete for Extreme Conditions: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
The Supply Chain: Discourse on Black Male College Football Players and Revenue Generation
Black Males and Intercollegiate Athletics: An Exploration of Problems and Solutions
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
