Considers an economic manufacturing quantity (EMQ) model with an unreliable production facility and a production process subject to random deterioration. Notes that the shift of the process to the“out‐of‐control” state, which may result in producing defective items, is recognized only through inspections; and that the production unit can be replaced preventively or overhauled after finishing a certain number of production runs. Proposes that the objective is to determine the lot size, inspection interval and a preventive replacement time minimizing the expected average cost per unit of time. Obtains the formula for the expected average cost for a generally distributed time to failure. Presents computational results and studies the joint effect of process deterioration and machine breakdowns on the optimal policy.
Article navigation
1 December 1995
Research Article|
December 01 1995
Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system
Viliam Makis;
Viliam Makis
University of Toronto, Toronto,Ontario, Canada
Search for other works by this author on:
James Fung
James Fung
University of Toronto, Toronto, Ontario, Canada
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7832
Print ISSN: 1355-2511
© MCB UP Limited
1995
Journal of Quality in Maintenance Engineering (1995) 1 (4): 41–55.
Citation
Makis V, Fung J (1995), "Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system". Journal of Quality in Maintenance Engineering, Vol. 1 No. 4 pp. 41–55, doi: https://doi.org/10.1108/13552519510105197
Download citation file:
New and popular articles
Suggested Reading
Comparison between finite element method and magnetic equivalent scheme to model an induction machine
COMPEL (December,1996)
The decomposition method applied to differential systems
Kybernetes (November,1995)
The Child‐Langmuir asymptotics for semiconductors including phonon interactions
COMPEL (September,1997)
Thermo‐hydro‐mechanical analysis of partially saturated porous materials
Engineering Computations (November,1996)
A model for the Smarandache anti‐geometry
International Journal of Social Economics (November,2002)
Related Chapters
Industrial rope access approach in the inspection and maintenance management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Comparison of bridge management practice in England and France
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Inspection, testing and monitoring of trunk road bridges in England
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
