In order to improve the construction effect, BIM technology is applied to the field of construction management. A multi objective optimization model was established in response to the demand for multi objective optimization, which considerations of two stages: time cost and time resource balance. The model was used to optimize resource allocation and reduce construction costs. Algorithm was used to solve the model and the optimal construction management plan suitable for large commercial builds was observed. Through the optimal construction management plan of this study, the optimal construction period for the project is determined to be 438 days. During this construction period, the cost of this phase of the project is RMB 2712.32 million (USD 384 million). Compared to the project planning cost, the total cost decreased by 17.05%. This indicates that through the collaborative work of construction management mode and BIM technology, the entire construction process of the project has been effectively optimized. The research technology provides a reference for the development of more advanced construction management technologies in the future.
Article navigation
June 2024
Research Article|
November 23 2023
Research on the application of Building Information Modeling in commercial building construction
Ying Yang
Architectural Engineering College, North China Institute of Science and Technology, Langfang, China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 26 2023
Accepted:
October 27 2023
Online ISSN: 2397-8759
Emerald Publishing Limited: All rights reserved
2024
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (2024) 177 (2): 116–126.
Article history
Received:
March 26 2023
Accepted:
October 27 2023
Citation
Yang Y (2024), "Research on the application of Building Information Modeling in commercial building construction". Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, Vol. 177 No. 2 pp. 116–126, doi: https://doi.org/10.1680/jsmic.23.00020
Download citation file:
632
Views
New and popular articles
Suggested Reading
Building information modelling execution plans: a global review
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (August,2022)
Key benefits of digital transformation for sustainable construction practices
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (December,2025)
Rule capture of automated compliance checking of building requirements: a review
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (July,2023)
Application of Building Information Modeling in cost control of engineering projects
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (October,2023)
Optimisation of energy consumption using building information modelling technology
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (September,2024)
Related Chapters
Conclusion
BIM in Principle and in Practice
Construction of a pre-cast concrete service reservoir using BIM
Maintaining the Safety of our Dams and Reservoirs: Proceedings of the 18th Biennial Conference of the British Dam Society at Queen’s University, Belfast, from 3–6 September 2014
Programme management contracts formation
Programme Management in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.