Cardiff Bay Barrage is one of the key elements in the urban regeneration of South Cardiff. This paper outlines the need for that regeneration and takes an overview of the barrage project. It considers the legislative process and the economic considerations that were necessary before the £120m structure could be constructed. Environmental considerations were important. The effect of the barrage on over-wintering wading birds and the loss of a Site of Special Scientific Interest had to be mitigated, a £10m fresh water habitat was constructed. Groundwater rise within the City of Cardiff consequent on construction of the barrage was reduced by provision of a dewatering system and a system of surveys on 25 000 properties ensure that any possible damage due to groundwater rise is identified and can be rectified. Water quality issues including oxygenation of the bay are considered. The barrage design is outlined as an introduction to subsequent papers. The contractual issues are discussed, the out-turn cost was only 5% above the estimated out-turn cost when the project commenced on site. The development outputs predicted when the project was under consideration have been achieved and the economic return on the project shows a pay back period of less than 2 years
Article navigation
June 2002
Research Article|
June 01 2002
Cardiff Bay Barrage Available to Purchase
D. Crompton
D. Crompton
Chairman, bar Konsult
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
December 05 2001
Accepted:
April 03 2002
Online ISSN: 1753-7800
Print ISSN: 1472-4561
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 81–88.
Article history
Received:
December 05 2001
Accepted:
April 03 2002
Citation
Crompton D (2002), "Cardiff Bay Barrage". Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering, Vol. 154 No. 2 pp. 81–88, doi: https://doi.org/10.1680/wame.2002.154.2.81
Download citation file:
Suggested Reading
Sustainable energy? A feasibility study for Eastside, Birmingham, UK
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (December,2006)
Project management of Greenwich peninsula
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2000)
Briefing: Guide Dogs announces results of shared surfaces research
Proceedings of the Institution of Civil Engineers - Municipal Engineer (June,2008)
Sars and the built environment in Hong Kong
Proceedings of the Institution of Civil Engineers - Municipal Engineer (March,2006)
Regeneration and the curious tale of gender blindness
International Journal of Public Sector Management (December,1998)
Related Chapters
Rethinking urban regeneration? Insights into the future through use of the Strategic-relational approach
Looking for Consensus?: Civil Society, Social Movements and Crises for Public Management
Collaborative Strategy for Tourism Development and Regeneration: Italy’s Coast of Naples
Knowledge Transfer to and within Tourism: Academic, Industry and Government Bridges
Urban drainage and development
ICE Handbook of Urban Drainage Practice
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.