The Lied Library was planned and constructed over a ten‐year period. During this process, the library staff tried to plan for new technology by making the building as flexible as possible. Although the staff had very little technological or planning experience in the early years, they were able to successfully plan a technologically advanced building. Much of the success of this venture came by researching technology, and constant revision of plans to incorporate changes. Through careful infrastructure planning, no major changes were needed to accommodate technological upgrades. and Kenneth E. Marks