Open figure viewer
Looks at the adhesive‐bonding process, arguing that quality control is generally lacking. Presents a “bonding chain” and goes on to apply quality assurance tools to the adhesive‐bonding process using three case studies to illustrate.
© MCB UP Limited
1997
You do not currently have access to this content.
