• Introduction

  • Part 1 – Construction of Substructure

  • 1.1 Programme

  • 1.2 Construction Constraints

  • 1.3 Construction Methods for Substructure

  • Part 2 – Matchcasting of Concrete Segments

  • 2.1 The Factory

  • 2.2 The West Rail Casting Area

  • 2.3 The Moulds

  • 2.4 Concrete

  • 2.5 Steel Reinforcement

  • 2.6 The Match-casting Process

  • 2.7 The Process in Detail

  • 2.8 Curing

  • 2.9 Test Cubes

  • 2.10 Demoulding

  • 2.11 Final Storage

This content is only available via PDF.