The primary containment structure for Sizewell ‘B’ PWR is the result of a number of years intensive development and design by Nuclear Electric (formerly Central Electricity Generating Board) and their design consultants Nuclear Design Associates (NDA). This paper identifies the significant features of the design, and the main stages of construction achieved thus far.

  • A) SYNOPSIS

  • B) INTRODUCTION

  • C) CONTAINMENT STRUCTURAL DESCRIPTION

  • D) DESIGN CODE

  • E) STRUCTURAL ANALYSIS AND DESIGN

  • F) 1/10TH SCALE MODEL TEST

  • G) LINER DESIGN

  • H) CONSTRUCTION APPROACH AND PROGRESS

  • I) CONCLUDING REMARKS

  • J) ACKNOWLEDGEMENTS

  • K) REFERENCES

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.