Purpose

This study develops a human-centric change management framework to address the gap between building information modelling (BIM) potential and its practical implementation and adoption in the construction industry by focusing on human factors influencing digital transformation success.

Design/methodology/approach

A multi-phased methodology was employed, combining systematic literature reviews with advanced network analysis techniques. Two literature review rounds extracted key change management activities and human-centric principles. Social network analysis (SNA) was utilised to quantify relationships and significance within the construction industry context, identifying high-centrality nodes in the network.

Findings

The analysis identified training, organisational competency assessment and resource allocation as the most critical change management activities for successful digital transformation, which emerged as central nodes. The study developed a tailored three-phase framework (Strategic initialisation, Operational transformation and Sustainable integration) that enables construction organisations to implement BIM and digital technologies while maintaining focus on human factors. Practical implications include improved employee engagement, reduced resistance to technological change, enhanced organisational readiness for digital transformation and a structured pathway for construction organisations to move beyond current BIM implementation barriers. The framework provides actionable guidance for construction leaders to balance technological advancement with human-centric values, ultimately supporting sustainable digital transformation in the industry.

Originality/value

This study offers a novel data-driven approach to digital transformation in construction by quantitatively analysing relationships between change management activities and human-centric principles. The research addresses a critical gap in BIM and digital transformation implementation literature by developing an integrated framework that balances technological advancement with human considerations, helping organisations move beyond current adoption barriers in the AECO industry’s transformative journey.

The concept of Industry 4.0, often referred to as the “fourth industrial revolution,” marks a significant transformation in the integration of production processes with advanced information technologies, such as cyber-physical systems, the Internet of Things (IoT), artificial intelligence (AI), and data analytics (Nowotarski and Paslawski, 2017). This revolution is characterised by increased automation and digitisation of industries, resulting in enhanced efficiency, productivity and innovation (Bradu et al., 2022; Qureshi, 2024). Although these advancements have transformed various sectors, the construction industry, traditionally reliant on manual labour and conventional methods, has been slower to adopt Industry 4.0 technologies (Maskuriy et al., 2019). The adoption of such technologies within construction, often termed “Construction 4.0,” remains in its early stages, with the pace of transformation varying significantly across regions due to differing levels of governmental support and industry enthusiasm (Timchuk et al., 2021; Wang et al., 2025).

As the construction industry begins to embrace digital transformation, a critical issue arises: How can construction organisations incorporate human-centric approaches into their digital transformation strategies? While Industry 4.0 technologies promise enhanced efficiency and automation, the construction industry faces unique challenges in balancing technological innovation with the human elements of the workforce. Creativity, emotional intelligence, and cognitive flexibility, as the key human attributes, are essential for driving sustainable and inclusive growth within this evolving digital landscape (Veling, 2014; Bidhendi and Poshdar, 2024; Townsend, 2024). However, as governments increase investments and revise legislation to encourage automation from project initiation to building management (Lat et al., 2021), there is a growing concern that human-centric principles could be overshadowed by the focus on digital and AI-driven efficiency (Zizic et al., 2022; Ghobakhloo et al., 2024; Li et al., 2025).

Despite significant investments in Building Information Modelling (BIM) and associated digital technologies, many construction organisations continue to struggle with successful implementation and integration (Munir et al., 2021; Boontae and Ussavadilokrit, 2024; Kordestani Ghalenoei et al., 2024). While technical barriers to BIM adoption have been extensively studied, the human and organisational dimensions that significantly impact implementation success have received less attention (Chowdhury et al., 2024; Moradi and Sormunen, 2024; Huang et al., 2025; Soman et al., 2025). The gap between BIM’s technological potential and its practical implementation highlights the need for a more comprehensive approach that addresses both technical and human factors.

Recent industry data highlights the extent of this implementation gap. While the global BIM market was valued at $8.12bn in 2024 and is projected to reach $22.08bn by 2032 (Fortune Business Insights, 2024), adoption rates reveal significant challenges. In developing countries such as India, surveys indicate that high hardware costs, high software costs, and low adoption across the supply chain constitute the top barriers to BIM pre-adoption (Mishra et al., 2024). Post-adoption challenges are equally concerning, with ongoing costs, shortage of skills and expertise, and unclear benefit evaluation hindering sustained implementation (Mishra et al., 2024). A comprehensive study of Malaysian construction professionals revealed that BIM-related challenges include knowledge gaps, infrastructure limitations, and modelling complexities, while project-related challenges encompass funding constraints, communication barriers, and coordination issues (Radzi et al., 2025). Furthermore, approximately 40% of small and medium-sized construction firms cite financial constraints as the primary barrier to BIM integration, with training requirements representing another significant hurdle (Global Growth Insights, 2024). These statistics underscore a critical paradox: while technological capabilities continue to advance, human and organisational factors remain the primary impediments to realising BIM’s transformative potential.

This study aims to address this research problem by exploring how human-centric principles can be integrated into the digital transformation efforts within the construction industry. It will specifically examine change management theories and models that can facilitate this integration. Change management theory focuses on the processes and methodologies that enable organisations to transition from their current state to a desired future state, factoring in both technological advancements and the impact on individuals and teams (Iskandar et al., 2020). However, traditional change management models may not fully account for the rapid technological changes, the need for continuous digital upskilling, or the unique challenges posed by the construction industry’s established processes (Robertson and De Vellis, 2023).

This study seeks to fill the gap by proposing a tailored change management framework designed to align human-centric principles with digital transformation strategies in construction. By conducting a systematic literature review, this paper will identify relevant change management models and human-centric principles applicable to construction organisations. The findings will inform the development of a specialised change management framework that supports both technological advancement and human-centred organisational practices.

This paper is structured as follows: Section 2 outlines the methodology used for the systematic literature review. Section 3 presents the key findings from the literature review, focusing on human-centric principles and change management activities relevant to the construction industry. Section 4 offers recommendations for developing an effective change management framework, and the Conclusions section summarises the key implications of this research and suggests future directions.

This study adopts a pragmatic research philosophy, which allows for the integration of multiple perspectives and methodologies to address practical research problems (Melnikovas, 2018). Pragmatism is particularly suitable for this research as it enables the combination of systematic literature analysis with quantitative network analysis techniques to develop practical solutions for industry challenges.

Building upon comparable quantitative analyses in construction research (Jafari et al., 2020; Wang et al., 2020; Liu et al., 2024), this study employed a multi-phased research design, utilising both systematic literature reviews (SLRs) and advanced network analysis techniques to develop a change management framework tailored for the construction industry with a focus on human-centric principles. The research methodology was carefully structured to identify and analyse change management activities and principles that prioritise human needs, while also quantifying their relationships and significance within the broader network of industry practices. This design ensures that the methodology aligns with the research objectives by integrating both qualitative and quantitative methods. The high-level research process is outlined in Figures 1 and 2 illustrates the research design flowchart.

Figure 1
A figure shows three stages of research workflow.The figure shows a horizontal flow diagram consisting of three rectangular blocks, each framed in a different colored border and connected by right-facing arrows. From left to right, the stages are labeled “Data Collection,” “Analysis,” and “Visualisation.” On the far left, the first block has an orange border and the heading “Data Collection.” Beneath it, the text states “Two rounds of Systematic Literature Review,” “Identification of Human-Centric Principles,” and “Identification of change management main activities.” To the right of this block, an orange arrow points toward the second block. The second block has a green border and the heading “Analysis.” The text within this block includes “Content analysis by Nvivo,” “Developing reference matrix,” “Developing adjacency diagram,” “Calculation of degree centrality measures,” “Analyzing interrelationships between change management activities and human-centric principles,” and “Tailoring a change management framework.” To the right of this block, a green arrow points toward the third block. The third block has a light blue border and the heading “Visualisation.” The text inside lists “Using advanced network analysis,” “Representing nodes (human-centric principles and change management activities) and their centrality through size or color,” and “Illustrating the connections between nodes with edges.”

Overview of the research process. Source: Authors’ own work

Figure 1
A figure shows three stages of research workflow.The figure shows a horizontal flow diagram consisting of three rectangular blocks, each framed in a different colored border and connected by right-facing arrows. From left to right, the stages are labeled “Data Collection,” “Analysis,” and “Visualisation.” On the far left, the first block has an orange border and the heading “Data Collection.” Beneath it, the text states “Two rounds of Systematic Literature Review,” “Identification of Human-Centric Principles,” and “Identification of change management main activities.” To the right of this block, an orange arrow points toward the second block. The second block has a green border and the heading “Analysis.” The text within this block includes “Content analysis by Nvivo,” “Developing reference matrix,” “Developing adjacency diagram,” “Calculation of degree centrality measures,” “Analyzing interrelationships between change management activities and human-centric principles,” and “Tailoring a change management framework.” To the right of this block, a green arrow points toward the third block. The third block has a light blue border and the heading “Visualisation.” The text inside lists “Using advanced network analysis,” “Representing nodes (human-centric principles and change management activities) and their centrality through size or color,” and “Illustrating the connections between nodes with edges.”

Overview of the research process. Source: Authors’ own work

Close modal
Figure 2
A workflow diagram shows two research paths from the research gap to framework development through analysis stages.The sequential research workflow begins at the left with a large circular node labeled “Research Gap,” which also contains a smaller dotted circle inside labeled “Start Point.” From this node, two arrows extend to the right, branching into two separate paths. The upper path begins with a circular node labeled “S L R 1: Human-centric Principles.” An arrow from this node leads to the circular node labeled “Analysis: Content analysis and coding.” Another arrow continues to a circular node labeled “S N A Network analysis of principles and activities,” and finally to a circular node labeled “Framework Development through literature.” The lower path from “Research Gap” extends to a circular node labeled “S L R 2 Change Management Activities.” An arrow connects this node to a circular node labeled “Analysis Content analysis and coding.” From here, an arrow continues upward, connecting to the “S N A Network analysis of principles and activities” node on the upper path, before ending at the final “Framework Development through literature” node.

Research design flowchart. Source: Authors’ own work

Figure 2
A workflow diagram shows two research paths from the research gap to framework development through analysis stages.The sequential research workflow begins at the left with a large circular node labeled “Research Gap,” which also contains a smaller dotted circle inside labeled “Start Point.” From this node, two arrows extend to the right, branching into two separate paths. The upper path begins with a circular node labeled “S L R 1: Human-centric Principles.” An arrow from this node leads to the circular node labeled “Analysis: Content analysis and coding.” Another arrow continues to a circular node labeled “S N A Network analysis of principles and activities,” and finally to a circular node labeled “Framework Development through literature.” The lower path from “Research Gap” extends to a circular node labeled “S L R 2 Change Management Activities.” An arrow connects this node to a circular node labeled “Analysis Content analysis and coding.” From here, an arrow continues upward, connecting to the “S N A Network analysis of principles and activities” node on the upper path, before ending at the final “Framework Development through literature” node.

Research design flowchart. Source: Authors’ own work

Close modal

This study adhered to the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) guidelines and applied content analysis to gather the necessary data aligned with the research objectives. PRISMA provides a standardised framework with a checklist, carefully followed here to uphold quality assurance and enhance the reproducibility of the review process.

2.1.1 Search procedure

Two systematic searches were carried out on Scopus, to ensure comprehensive coverage while maintaining search precision and relevance. This dual-search approach was necessitated by the distinct nature of the two core research components: human-centric principles and change management activities.

Keywordsand synonyms relevant to each topic were combined to form the search term, as outlined in Table 1, and searches targeted the article titles, abstracts, and keywords.

Table 1

Search query

Search databasesSearch term
Scopus (SLR1)(“Human centric” OR “Human element” OR “people centric” OR “People oriented” OR “People focused”) AND (“Digital transformation” OR “Digital” OR “Technology”) AND (“Construction”)
Scopus (SLR2)(“change management” OR “change model” OR “change theory” OR “organisational change”) AND (“Digital transformation” OR “Digital” OR “Technology”) AND (“Construction”)
Source(s): Authors’ own work

2.1.2 Eligibility criteria and screening process

To assess the quality of the selected articles, specific inclusion and exclusion criteria were applied to ensure both relevance to the research objectives and methodological rigour, as detailed in Table 2.

Table 2

Employed eligibility criteria

Inclusion criteriaExclusion criteria
Written in EnglishPapers in languages other than English
Peer-reviewed publicationsNot peer-reviewed scientific reports and documents
Relevant to the aims of this studyOutside the scope of this research
Within the scope of the construction industryNot applicable to the construction industry
Source(s): Authors’ own work

A multi-step process was also used to screen and review the papers that were initially identified. In the first stage, Scopus filters, such as document type, subject area, and source title, were applied to narrow down the articles and exclude those that did not meet the eligibility criteria. This was followed by removing duplicates, screening titles and abstracts, and applying inclusion and exclusion criteria during the full-text review. To capture essential publications, backward and forward citation searches were also conducted.

Social Network Analysis (SNA) is a research method that examines relationships between different elements by treating them as a network of connected points (similar to mapping connections in a social group), particularly degree centrality, quantify each element’s importance by measuring its connections to other elements. SNA leverages graph theory to examine how variables within a network are interconnected, enabling insights into network behaviour (Elsayegh and El-adaway, 2021). SNA was selected over alternative methods such as correlation analysis or factor analysis because it captures relational patterns between elements rather than treating them as independent variables, which is essential for understanding how change management activities and human-centric principles function as an integrated system. Unlike qualitative content analysis alone, SNA provides quantitative centrality measures to objectively identify the most influential elements within the network.

SNA represents these connections through nodes and edges, using various metrics for detailed analysis. Among these, centrality measures, especially degree centrality (DC), are widely regarded as effective for determining a node’s significance in a network (Hosseini et al., 2018). This study applies DC to quantify the importance of each node, with SNA chosen for its capability to assess interactions between human-centric principles and change management activities. Additionally, SNA offers valuable visualisations that reveal underlying connections and patterns often missed in simpler analyses (Sheikhkhoshkar et al., 2023).

The systematic search and screening process identified 64 sources (journals, conference papers, and reports), which formed the foundation for the study’s analysis. From this comprehensive review, the study identified 10 change management models, which served as the basis for extracting 20 change management main activities and numerous human-centric principles. These findings will be elaborated upon in subsequent sections.

To begin with, this study commenced with the implementation of two systematic literature reviews (SLRs). The primary SLR focused on examining various change management models, with the aim of extracting the fundamental activities associated with them. The secondary SLR delved into exploring human-centric principles, specifically within the construction industry. Both SLRs strictly adhered to the PRISMA guidelines in Figures 3 and 4, ensuring a structured and transparent process throughout. For SLR1 (Human-Centric Principles), the initial Scopus search yielded 178 records. After applying document type and language filters, 120 records remained. Following duplicate removal, 95 records underwent title and abstract screening, with 54 records excluded due to insufficient relevance to human-centric principles in construction, technology focus without human considerations, and lack of theoretical foundation. This resulted in 41 records for full-text assessment, with 5 additional exclusions during full-text review, yielding 36 papers plus 5 organisational reports, ultimately 41 studies.

Figure 3
A PRISMA flow diagram of the first round literature review showing two data sources.The figure is divided into two main vertical sections, each showing a flowchart. The flowchart on the left is titled “Identification of studies via databases and registers,” and the flowchart on the right is titled “Identification of studies via other methods.” The flow is represented through three vertical text boxes indicating the stages “Identification,” “Screening,” and “Included,” arranged in a vertical series. In the first section, “Identification of studies via databases and registers,” the “Identification” stage begins with a text box labeled “Records identified from Scopus Databases (n equals 178).” A right-pointing arrow leads to another box labeled “Records removed before screening: Records marked as ineligible by automation tools (n equals 58), and Records removed for reasons (n equals 25).” From “Records identified from Scopus Databases (n equals 178),” a downward-pointing arrow leads to a text box labeled “Records screened (n equals 95)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded double asterisk (n equals 38).” From “Records screened (n equals 95),” a downward-pointing arrow leads to a text box labeled “Records sought for retrieval (n equals 57)” in the same “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 16).” From “Records sought for retrieval (n equals 57),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 41)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded: Out of Scope 1 (n equals 5).” From “Records assessed for eligibility (n equals 41),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 36) Records of included studies (n equals 5).” In the second section, “Identification of studies via other methods,” the “Identification” stage contains a text box labeled “Records identified from Websites (n equals 2) Organisations (n equals 3).” A downward-pointing arrow from this box leads to a text box labeled “Records sought for retrieval (n equals 5)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 0).” From “Records sought for retrieval (n equals 5),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 5)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded (n equals 0).” From “Records assessed for eligibility (n equals 5),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 36) Records of included studies (n equals 5).”

The first round of literature review (Human-Centric Principles) using PRISMA guidelines. Source: Authors’ own work

Figure 3
A PRISMA flow diagram of the first round literature review showing two data sources.The figure is divided into two main vertical sections, each showing a flowchart. The flowchart on the left is titled “Identification of studies via databases and registers,” and the flowchart on the right is titled “Identification of studies via other methods.” The flow is represented through three vertical text boxes indicating the stages “Identification,” “Screening,” and “Included,” arranged in a vertical series. In the first section, “Identification of studies via databases and registers,” the “Identification” stage begins with a text box labeled “Records identified from Scopus Databases (n equals 178).” A right-pointing arrow leads to another box labeled “Records removed before screening: Records marked as ineligible by automation tools (n equals 58), and Records removed for reasons (n equals 25).” From “Records identified from Scopus Databases (n equals 178),” a downward-pointing arrow leads to a text box labeled “Records screened (n equals 95)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded double asterisk (n equals 38).” From “Records screened (n equals 95),” a downward-pointing arrow leads to a text box labeled “Records sought for retrieval (n equals 57)” in the same “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 16).” From “Records sought for retrieval (n equals 57),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 41)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded: Out of Scope 1 (n equals 5).” From “Records assessed for eligibility (n equals 41),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 36) Records of included studies (n equals 5).” In the second section, “Identification of studies via other methods,” the “Identification” stage contains a text box labeled “Records identified from Websites (n equals 2) Organisations (n equals 3).” A downward-pointing arrow from this box leads to a text box labeled “Records sought for retrieval (n equals 5)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 0).” From “Records sought for retrieval (n equals 5),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 5)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded (n equals 0).” From “Records assessed for eligibility (n equals 5),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 36) Records of included studies (n equals 5).”

The first round of literature review (Human-Centric Principles) using PRISMA guidelines. Source: Authors’ own work

Close modal
Figure 4
A PRISMA flow diagram of the second round review showing study identification, screening, eligibility, and inclusion.The figure is divided into two main vertical sections, each showing a flowchart. The flowchart on the left is titled “Identification of studies via databases and registers,” and the flowchart on the right is titled “Identification of studies via other methods.” The flow is represented through three vertical text boxes indicating the stages “Identification,” “Screening,” and “Included,” arranged in a vertical series. In the first section, “Identification of studies via databases and registers,” the “Identification” stage begins with a text box labeled “Records identified from Scopus Databases (n equals 345).” A right-pointing arrow leads to another box labeled “Records removed before screening: Records marked as ineligible by automation tools (n equals 102), and Records removed for reasons (n equals 96).” From “Records identified from Scopus Databases (n equals 345),” a downward-pointing arrow leads to a text box labeled “Records screened (n equals 147)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded double asterisk (n equals 99).” From “Records screened (n equals 147),” a downward-pointing arrow leads to a text box labeled “Records sought for retrieval (n equals 48)” in the same “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 19).” From “Records sought for retrieval (n equals 48),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 29)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded: Out of Scope 1 (n equals 8).” From “Records assessed for eligibility (n equals 29),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 21) Records of included studies (n equals 2).” In the second section, “Identification of studies via other methods,” the “Identification” stage contains a text box labeled “Records identified from Websites (n equals 0), Organisations (n equals 2).” A downward-pointing arrow from this box leads to a text box labeled “Records sought for retrieval (n equals 2)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 0).” From “Records sought for retrieval (n equals 2),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 2)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded (n equals 0).” From “Records assessed for eligibility (n equals 5),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 21) Records of included studies (n equals 2).”

The second round of literature review (Change Management activities) using PRISMA guidelines. Source: Authors’ own work

Figure 4
A PRISMA flow diagram of the second round review showing study identification, screening, eligibility, and inclusion.The figure is divided into two main vertical sections, each showing a flowchart. The flowchart on the left is titled “Identification of studies via databases and registers,” and the flowchart on the right is titled “Identification of studies via other methods.” The flow is represented through three vertical text boxes indicating the stages “Identification,” “Screening,” and “Included,” arranged in a vertical series. In the first section, “Identification of studies via databases and registers,” the “Identification” stage begins with a text box labeled “Records identified from Scopus Databases (n equals 345).” A right-pointing arrow leads to another box labeled “Records removed before screening: Records marked as ineligible by automation tools (n equals 102), and Records removed for reasons (n equals 96).” From “Records identified from Scopus Databases (n equals 345),” a downward-pointing arrow leads to a text box labeled “Records screened (n equals 147)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded double asterisk (n equals 99).” From “Records screened (n equals 147),” a downward-pointing arrow leads to a text box labeled “Records sought for retrieval (n equals 48)” in the same “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 19).” From “Records sought for retrieval (n equals 48),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 29)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded: Out of Scope 1 (n equals 8).” From “Records assessed for eligibility (n equals 29),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 21) Records of included studies (n equals 2).” In the second section, “Identification of studies via other methods,” the “Identification” stage contains a text box labeled “Records identified from Websites (n equals 0), Organisations (n equals 2).” A downward-pointing arrow from this box leads to a text box labeled “Records sought for retrieval (n equals 2)” in the “Screening” stage. A right-pointing arrow from this box leads to a text box labeled “Records not retrieved (n equals 0).” From “Records sought for retrieval (n equals 2),” a downward-pointing arrow leads to a text box labeled “Records assessed for eligibility (n equals 2)” in the same stage. A right-pointing arrow from this box leads to a text box labeled “Records excluded (n equals 0).” From “Records assessed for eligibility (n equals 5),” a downward-pointing arrow leads to a text box in the “Included” stage labeled “Studies included in review (n equals 21) Records of included studies (n equals 2).”

The second round of literature review (Change Management activities) using PRISMA guidelines. Source: Authors’ own work

Close modal

For SLR2 (Change Management Activities), the initial search identified 345 records, reduced to 102 after filters, and 96 after duplicate removal. Title and abstract screening excluded 118 records primarily due to a lack of specific change management activities, resulting in 29 records for full-text review. Eight records were excluded during full-text assessment, yielding 21 papers plus 2 organisational reports, ultimately 23studies.

This rigorous approach resulted in the compilation of a comprehensive list of change management activities and human-centric principles, which were subsequently refined through content analysis utilising NVivo software.

After the screening phase, a content analysis was conducted on 41 papers to identify human-centric principles and 23 papers to identify change management’s main activities. The finalised papers were systematically coded to extract human-centric principles through automated content analysis, identifying themes based on frequency and conceptual clustering (detailed procedures in  Appendix A.1).

Furthermore, a deep dive into ten change management models extracted from the 23 papers resulted in the identification of 20 change management activities considered essential and beneficial for the purpose of this study (detailed in Table 3). Additionally, a total of 3,813 human-centric principles were extracted from the 41 approved papers. To streamline the analysis, the authors aggregated principles with similar concepts and removed irrelevant and duplicated principles, ultimately resulting in a refined set of 419 human-centric principles under the 18 categorised principles for further analysis (comprehensively presented in Table 4 with representative subcategories and mention frequencies).

Table 3

Highlighted change management activities

IDChange management activityReference
CHA_1Defining a clear vision and strategyMento et al. (2002), Chuang and Yang (2023) 
CHA_2Alignment with mission and strategyRaineri (2011), İkinci (2014), Sung and Kim (2021) 
CHA_3Creating a sense of necessityBugubayeva et al. (2017), Lugonja (2020), Pacolli (2022) 
CHA_4Assessing organisational competenciesAl-Haddad and Kotnour (2015), Pacolli (2022) 
CHA_5Considering individual skills and abilitiesBellantuono et al. (2021) 
CHA_6Allocating sufficient resourcesAlban (1987), Ali et al. (2021) 
CHA_7Establish a skilled and experienced change teamBullock and Batten (1985), Beckhard (1987), Smith et al. (2014) 
CHA_8Constant communication with all stakeholders during changeGalli (2018) 
CHA_9Monitoring and evaluating communication effectivenessBullock and Batten (1985), Beckhard (1987), Smith et al. (2014) 
CHA_10Motivating the change agentsKickert (2014), Galli (2018) 
CHA_11Creating quick winsAnthony Mento and Dirndorfer (2002), Brisson-Banks (2010) 
CHA_12Engaging stakeholdersRamiah and Moore (2023), Wernicke et al. (2023) 
CHA_13TrainingAl-ohali et al. (n.d.), Wernicke et al. (2023) 
CHA_14Identifying and managing resistance to changeJoseph (2020), Lugonja (2020), Ramiah and Moore (2023) 
CHA_15Establish and empower change leadershipBurnes (2004), Kickert (2014), Frost et al. (2020), Lugonja (2020), Carnicero et al. (2021), Petersson et al. (2022), Shaharruddin and Musa (2022) 
CHA_16Continuous improvementJonas (202), Kabashkin et al. (2023) 
CHA_17Developing a change planBurnes (2004) 
CHA_18Progress monitoringBullock and Batten (1985), Wincek et al. (2013), Bugubayeva et al. (2017) 
CHA_19Integrating lessons learnedBrisson-Banks (2010), Bugubayeva et al. (2017) 
CHA_20Developing reinforcement strategy and creating cultural fitFrost et al. (2020), Etareri et al. (2022) 
Source(s): Authors’ own work
Table 4

Identified human-centric principles

IDCategoryNumber of codesRepresentative subcategoriesNumber of mentions
HCP_1Human Capabilities53Human experience10
Human values6
Human intelligence4
HCP_2Individual Requirements25Individual assessments4
Individual creativity4
Individual needs3
HCP_3Work Environment46changed work practices12
social work practice7
future works4
HCP_4System Thinking38Cyber-physical systems10
Entire system6
integrated system5
HCP_5Process24Organisation processes4
Process management3
Process optimisation3
HCP_6Organisational Essentials17Human-centred organisations5
Learning organisation4
Innovative organisation3
HCP_7Business Requirement19Business value creation4
Business case4
Business ethics3
HCP_8Interactions16Employee interactions4
Human-system interaction3
Interaction designs2
HCP_9Environment7Learning environments3
Changing environment conditions3
Supportive environment3
HCP_10Management Skills29Change management5
Project management5
Human resource management4
HCP_11Tasks Separation28Dynamic task planning3
Task management3
Collaborative tasks3
HCP_12Design Requirements17Process design10
Innovation design approach4
Human-centred design4
HCP_13Leadership approach17Human-centred approach12
Innovative approaches5
Six sigma approach3
HCP_14Development Path14sustainable development8
Employee development7
strategy development5
HCP_15Change Management Strategy16Organisational change13
Sustainable changes5
Innovative change3
HCP_16Knowledge Management25Knowledge management5
Knowledge sharing3
Organisational knowledge3
HCP_17Value13Human values6
Value maximisation4
Shared values3
HCP_18Technology Requirements15artificial intelligence technology3
knowledge management technologies3
Communications technologies3
Source(s): Authors’ own work

Table 5 presents the 10 change management models identified through the literature review, which could play a crucial role in shaping the construction industry’s digital transformation strategies. These models provided the foundation for identifying the main activities in change management.

Table 5

Change management models

RowChange management modelReference
1Kotter’s 8-Step Change ModelKotter (1995) 
2Lewin’s Three-step Change ModelJuneja (2020) 
3ADKARAli et al. (2021) 
4McKinsey’s 7-SEtareri (2022) 
5Bridges' Model of TransitionMiller (2017) 
6Bullock and Batten’s Change ModelBullock and Batten (1985) 
7Mento et al.'s Change ModelMento et al. (2002) 
8KickertKickert (2014) 
9Change Formula of Beckhard and HarrisBeckhard (1987) 
10Change Management Body Of KnowledgeSmith et al. (2014) 
Source(s): Authors’ own work

The 20 change management activities are derived from the 10 change management models listed in Table 5. These activities were identified through a rigorous content analysis using NVivo software, as described in the research design section. Activities were classified as “critical” if they appeared in more than one model, reflecting a broad consensus on their importance in effective change management practices.

This systematic approach ensures that the activities presented have been consistently recognised across different change management frameworks. Table 3 provides a detailed breakdown of these activities, which form the foundation for implementing effective change management strategies in human-centric digital transformation efforts.

The systematic analysis yielded 419 human-centric principles, consolidated into 18 categories. Only principles mentioned in at least 3 sources were considered for analysis. The final categorisation into 18 groups was based on both automated clustering and manual review by the researchers, allowing for a more detailed examination of how these principles interact with the identified change management activities.

Social Network Analysis (SNA) was employed to quantitatively assess the relationships between identified change management activities and human-centric principles. The analysis was conducted by constructing a bipartite network graph “G = (V, E)”, where V represents the set of vertices (nodes) and “E” the set of edges (connections). Nodes were defined as “V = A ∪ P”, with “A” representing the set of activities and “P” the set of principles, ensuring no overlap (“A ∩ P = ∅”). Edges were determined based on the co-occurrence matrix C, derived from the literature, where “C_ij = 1” if activity “i” is connected to principle “j”, and “0” otherwise. The graph was then analysed using the NetworkX library in Python to explore the network structure and quantify the interconnectedness of the nodes.

In the systematic mapping of change management activities to human-centred principles, the research methodology adopted a scientifically rigorous approach, ensuring that all relationships were derived from a replicable process, free from subjective bias. The stages involved were as follows:

  1. Automated Text Analysis: The initial extraction of human-centred principles was facilitated by the application of NVivo software, which utilised advanced natural language processing algorithms to systematically identify recurring themes from the literature. This approach ensured an unbiased, data-driven foundation for the mapping.

  2. Co-occurrence Matrix Generation: The extracted themes were then used to construct a co-occurrence matrix. In this matrix, binary indicators (1 or 0) denoted the presence or absence of a relationship between each pair of change management activity and human-centred principle, based on their concurrent mention within the themes of the literature reviewed.

  3. Conceptual Validity: The contextual application of each principle and activity was examined, ensuring that their pairing was conceptually valid and substantiated by evidence in the literature.

Centrality measures were calculated to identify the prominence of each node within the network, essentially determining which elements are most connected and influential (Jafari et al., 2020; Liu et al., 2024). The degree centrality for a node “v”, representing its connectedness, was computed using the formula:

Where “deg(v)” is the degree of node “v” (i.e. the number of direct connections) and “n-1” is the maximum possible degree in the network (i.e. the total number of other nodes it could potentially connect to). Centrality measures were normalised to enable standardised comparison across all network nodes, identifying the relative importance of each change management activity and human-centric principle (calculation details in  Appendix A.3).

To visually validate and interpret the network structure, we employed comprehensive visual analytics techniques following established methodologies in bibliometric studies (Elsayegh and El-adaway, 2021; Sheikhkhoshkar et al., 2023). Network visualisation was generated with node sizes proportional to their centrality values, enabling intuitive identification of the most influential elements (Figure 5). Visual encoding used colour intensity to represent centrality levels, with darker nodes indicating higher influence within the network (Visual encoding parameters are detailed in  Appendix A.4). The scripts developed facilitated an advanced analysis, which forms the foundation for our proposed change management model, emphasising its adaptability and human-centric focus within the evolving landscape of the construction industry.

Figure 5
A heatmap shows links between 18 human-centric principles and 20 change management activities with a strength scale.The horizontal axis represents labeled “Change Management Activities” and marked with “C M A underscore 1” to “C M A underscore 20,” arranged from left to right. The vertical axis is labeled “Human-Centric Principles,” and is marked with “H C P underscore 1” to “H C P underscore 18,” arranged from top to bottom. The color scale on the labeled shows “Connection Strength” ranging from 0.0 (light yellow) to 1.0 (dark red), with darker shades indicating stronger connections. For H C P underscore 1, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (1), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 2, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (1). For H C P underscore 3, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 4, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 5, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 6, the connection values are: C M A underscore 1 (1), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 7, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 8, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 9, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 10, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 11, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 12, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 13, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 14, the connection values are: C M A underscore 1 (0), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 15, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 16, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (1), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 17, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 18, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0).

Mapping of change management’s main activities and the human-centric principles. Source: Authors’ own work

Figure 5
A heatmap shows links between 18 human-centric principles and 20 change management activities with a strength scale.The horizontal axis represents labeled “Change Management Activities” and marked with “C M A underscore 1” to “C M A underscore 20,” arranged from left to right. The vertical axis is labeled “Human-Centric Principles,” and is marked with “H C P underscore 1” to “H C P underscore 18,” arranged from top to bottom. The color scale on the labeled shows “Connection Strength” ranging from 0.0 (light yellow) to 1.0 (dark red), with darker shades indicating stronger connections. For H C P underscore 1, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (1), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 2, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (1). For H C P underscore 3, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 4, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 5, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 6, the connection values are: C M A underscore 1 (1), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 7, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 8, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 9, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 10, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 11, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 12, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 13, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 14, the connection values are: C M A underscore 1 (0), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (1), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (1), C M A underscore 11 (1), C M A underscore 12 (0), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 15, the connection values are: C M A underscore 1 (1), C M A underscore 2 (1), C M A underscore 3 (0), C M A underscore 4 (0), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (0), C M A underscore 13 (0), C M A underscore 14 (0), C M A underscore 15 (1), C M A underscore 16 (0), C M A underscore 17 (1), C M A underscore 18 (1), C M A underscore 19 (1), C M A underscore 20 (0). For H C P underscore 16, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (0), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (1), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (1). For H C P underscore 17, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (1), C M A underscore 4 (1), C M A underscore 5 (0), C M A underscore 6 (0), C M A underscore 7 (0), C M A underscore 8 (1), C M A underscore 9 (1), C M A underscore 10 (0), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (1), C M A underscore 15 (0), C M A underscore 16 (1), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0). For H C P underscore 18, the connection values are: C M A underscore 1 (0), C M A underscore 2 (0), C M A underscore 3 (0), C M A underscore 4 (1), C M A underscore 5 (1), C M A underscore 6 (0), C M A underscore 7 (1), C M A underscore 8 (0), C M A underscore 9 (0), C M A underscore 10 (1), C M A underscore 11 (0), C M A underscore 12 (1), C M A underscore 13 (1), C M A underscore 14 (0), C M A underscore 15 (0), C M A underscore 16 (0), C M A underscore 17 (0), C M A underscore 18 (0), C M A underscore 19 (0), C M A underscore 20 (0).

Mapping of change management’s main activities and the human-centric principles. Source: Authors’ own work

Close modal

To explore the relationships between change management activities and human-centric principles, a reference matrix V was developed. This matrix has dimensions of 18 by 20, representing the 18 categories of human-centric principles and 20 change management activities identified in two SLR processes.

Each element of the matrix, V (i, j)e.

  1. 1 indicates a relationship between activity i and principle category j, meaning they co-occur in the reviewed literature and

  2. 0 indicates no relationship.

The data from Matrix V is presented in Figure 5, showing how specific change management activities align with human-centric principles. The figure reflects the binary values from Matrix V, where 1 indicates a relationship and 0 indicates no relationship.

Figure 5 presents the binary mapping matrix where dark cells (value = 1) indicate established relationships between change management activities (rows) and human-centric principles (columns), while white cells (value = 0) indicate no documented relationship in the literature. This mapping serves as the basis for the subsequent network analysis, where these relationships are explored in more detail.

An adjacency matrix was generated from the reference matrix. The values within this matrix represent the weight of connections between nodes, with cells colour-coded to reflect the strength of these connections, as depicted in Figure 6. Figure 6 displays the adjacency matrix where colour intensity represents connection strength between human-centric principles. White cells indicate no co-occurrence (weight = 0), light orange indicates moderate connections (weight = 1–2), and dark orange indicates strong interconnections (weight = 3+). The strong connection between HCP_14 (Development Path) and HCP_2 (Individual Requirements), shown in dark orange, suggests these principles frequently co-occur in change management contexts, indicating their complementary nature in organisational transformation.

Figure 6
A heatmap shows Human-Centric Principles against Change Management Activities with shades indicating relationship intensity.The horizontal axis represents labeled “Change Management Activities” and marked with “C M A underscore 1” to “C M A underscore 20,” arranged from left to right. The vertical axis is labeled “Human-Centric Principles,” and is marked with “H C P underscore 1” to “H C P underscore 18,” arranged from top to bottom. The color scale on the right side is labeled “Relationship Intensity,” ranging from 0.0 (light yellow) to 7.0 (dark orange), with darker shades indicating stronger connections. The triangular heatmap matrix shows varying intensities across intersections of Human-Centric Principles and Change Management Activities, where several darker orange squares appear around H C P underscore 5, H C P underscore 6, H C P underscore 13, H C P underscore 14, and H C P underscore 17, reflecting higher relationship intensities at those intersections.

Adjacency matrix of human-centric principles. Source: Authors’ own work

Figure 6
A heatmap shows Human-Centric Principles against Change Management Activities with shades indicating relationship intensity.The horizontal axis represents labeled “Change Management Activities” and marked with “C M A underscore 1” to “C M A underscore 20,” arranged from left to right. The vertical axis is labeled “Human-Centric Principles,” and is marked with “H C P underscore 1” to “H C P underscore 18,” arranged from top to bottom. The color scale on the right side is labeled “Relationship Intensity,” ranging from 0.0 (light yellow) to 7.0 (dark orange), with darker shades indicating stronger connections. The triangular heatmap matrix shows varying intensities across intersections of Human-Centric Principles and Change Management Activities, where several darker orange squares appear around H C P underscore 5, H C P underscore 6, H C P underscore 13, H C P underscore 14, and H C P underscore 17, reflecting higher relationship intensities at those intersections.

Adjacency matrix of human-centric principles. Source: Authors’ own work

Close modal

While the adjacency matrix in Figure 6 illustrates the complex interconnections between human-centric principles, it does not directly indicate which elements are most critical for driving digital transformation in change management. To gain deeper insights, a centrality analysis was performed in the following section to identify the most influential nodes within the network.

To further explore the relative importance of each node in the network, a centrality analysis was performed. Centrality measures quantify the influence of each change management activity and human-centric principle within the network by identifying the most connected and influential nodes. This analysis helps determine which elements play a pivotal role in facilitating digital transformation.

The degree centrality of each node was calculated and normalised, allowing for comparison across the network. Figure 7 presents the results of the centrality analysis, where:

Figure 7
A network graph shows nodes labeled H C P and C H A with connecting lines and a color scale for normalized degree centrality.The network graph is titled “Network Graph with Normalized Degree Centrality.” A color scale on the right side is labeled “Normalized Degree Centrality” and ranges from 0.0 (light beige) to 1.0 (dark brown). The graph displays interconnected circular nodes with labels. From the top right and moving down, nodes are labeled as follows: “H C P underscore 8,” “H C P underscore 3,” “H C P underscore 7,” “H C P underscore 1,” “H C P underscore 9,” “C H A underscore 7,” “C H A underscore 5,” “C H A underscore 16,” “C H A underscore 14,” “C H A underscore 19,” “C H A underscore 4,” “H C P underscore 18,” “C H A underscore 13,” “C H A underscore 18,” “C H A underscore 6,” “H C P underscore 17,” “H C P underscore 5,” “H C P underscore 4,” “C H A underscore 17,” “H C P underscore 14,” “H C P underscore 16,” “H C P underscore 6,” “C H A underscore 11,” “C H A underscore 12,” “H C P underscore 11,” “H C P underscore 15,” “H C P underscore 12,” “H C P underscore 2,” “C H A underscore 8,” “H C P underscore 13,” “C H A underscore 10,” “C H A underscore 9,” “C H A underscore 3,” “C H A underscore 2,” “C H A underscore 15,” “C H A underscore 1,” “C H A underscore 20,” and “H C P underscore 10.” Lines connect multiple nodes, forming a dense network in the center with dark brown shaded nodes such as “H C P underscore 14,” “H C P underscore 2,” and the dark orange shaded node “H C P underscore 6” appears.

Normalised degree of centrality for change management activities and categories of human-centric principles. Source: Authors’ own work

Figure 7
A network graph shows nodes labeled H C P and C H A with connecting lines and a color scale for normalized degree centrality.The network graph is titled “Network Graph with Normalized Degree Centrality.” A color scale on the right side is labeled “Normalized Degree Centrality” and ranges from 0.0 (light beige) to 1.0 (dark brown). The graph displays interconnected circular nodes with labels. From the top right and moving down, nodes are labeled as follows: “H C P underscore 8,” “H C P underscore 3,” “H C P underscore 7,” “H C P underscore 1,” “H C P underscore 9,” “C H A underscore 7,” “C H A underscore 5,” “C H A underscore 16,” “C H A underscore 14,” “C H A underscore 19,” “C H A underscore 4,” “H C P underscore 18,” “C H A underscore 13,” “C H A underscore 18,” “C H A underscore 6,” “H C P underscore 17,” “H C P underscore 5,” “H C P underscore 4,” “C H A underscore 17,” “H C P underscore 14,” “H C P underscore 16,” “H C P underscore 6,” “C H A underscore 11,” “C H A underscore 12,” “H C P underscore 11,” “H C P underscore 15,” “H C P underscore 12,” “H C P underscore 2,” “C H A underscore 8,” “H C P underscore 13,” “C H A underscore 10,” “C H A underscore 9,” “C H A underscore 3,” “C H A underscore 2,” “C H A underscore 15,” “C H A underscore 1,” “C H A underscore 20,” and “H C P underscore 10.” Lines connect multiple nodes, forming a dense network in the center with dark brown shaded nodes such as “H C P underscore 14,” “H C P underscore 2,” and the dark orange shaded node “H C P underscore 6” appears.

Normalised degree of centrality for change management activities and categories of human-centric principles. Source: Authors’ own work

Close modal
  1. Darker nodes represent change management activities and categories of human-centric principles with higher centrality values, indicating stronger influence and higher interconnectedness within the network.

  2. Lighter nodes represent activities and categories of principles with lower centrality values, indicating a relatively weaker influence on the network structure.

For example, CHA_13 (Training) and HCP_14 (Development Path) were found to be highly influential, connecting multiple activities and principles. These elements, due to their higher centrality, are likely to play a critical role in driving effective change management in the context of digital transformation.

The network analysis conducted in this study uncovers a detailed and intricate map of the connections between change management activities and human-centred principles in the context of digital transformation within the construction industry. By conducting two rounds of systematic literature review, we carefully identified and mapped a network of interconnected change management activities and human-centred principles. The resulting binary matrix and network visualisation, which were generated using rigorous scientific methods instead of subjective opinions, offer solid empirical evidence supporting the resulting binary relationship matrix.

The visual analytics and normalised centrality calculations, conducted using Python and supported by Social Network Analysis (SNA), revealed the crucial role of these activities and principles in effective change management. The strategic emphasis on high-centrality nodes suggests a new paradigm in managing organisational change. This finding aligns with recent works, that similarly identified the importance of integrating technological advancement with human factors in construction automation (Turek et al., 2017; Jafari et al., 2020; Singh et al., 2022; Zhang et al., 2023; Bidhendi and Poshdar, 2024). Our network analysis extends their findings by quantifying these relationships through advanced metrics.

The discussions in this study focus on the importance of specific nodes within the network. Activities such as training (CHA_13), assessing organisational competencies (CHA_4), developing a change plan (CHA_17), allocating sufficient resources (CHA_6), and human-centred principles such as individual requirements (HCP_2), development path (HCP_14), organisational essentials (HCP_6), and process (HCP_5) are among the most interconnected nodes within the network. These nodes have consistently shown to be focal points in the literature, suggesting their fundamental role in catalysing effective change within organisations. This finding supports recent research by Davila Delgado et al. (2019), who emphasised the importance of organisational readiness and awareness in successful construction robotics implementation. The centrality of these elements reinforces their significance in our tailored change management framework, underscoring the need for organisations to ignite a shared urgency for change and to fully harness the potential of their human capital.

Conversely, principles such as value (HCP_17), interactions (HCP_8), tasks separation (HCP_11), management skills (HCP_10), human capabilities (HCP_1), and technology requirements (HCP_18), which demonstrate moderate to low centrality, signify areas where change management activities may need to be developed or emphasised. These principles are crucial for a holistic human-centred approach yet may be underrepresented in current change management strategies. This finding aligns with work by Wang et al. (2025), who identified similar gaps in technology adoption readiness. By incorporating activities that directly support these principles, such as reinforcing shared values or aligning technology with human needs, organisations can aspire to a more comprehensive and inclusive change management approach.

The customised change management framework (Figure 8) hinges on two key pillars: focusing on the most central activities and principles and fostering the less-connected yet vital human-centred principles. This dual strategy aims to ensure that both high-impact activities and underrepresented but critical principles are effectively incorporated into organisational change strategies.

Figure 8
A circular diagram with four concentric circles shows phases, categories, and activities of a change management framework.The diagram shows four concentric circles with the inner small circle labeled “Transformation.” The second circle outer to the innermost is divided into three sections labeled from top and moving clockwise as “Sustainable Integration Phase,” “Strategic Initiation Phase,” and “Operational Transformation Phase.” The third circle subdivides each of these into smaller sections. Under “Sustainable Integration Phase,” the sections are “Performance Monitoring and Feedback,” “Value Integration Program,” and “Cultural Reinforcement.” Under “Strategic Initiation Phase,” the sections are “Strategic Vision and Communication,” “Organizational Competencies Assessment,” and “Well-being & Support Structure.” Under “Operational Transformation Phase,” the sections are “Resource Allocation,” “Training and Development,” “Technological Adoption,” and “Employee Involvement and Empowerment.” The fourth and outermost circle lists specific activities for each subsection. Under “Performance Monitoring and Feedback,” the activities are “Measurement Framework Development,” “Monitoring Systems Implementation,” “Feedback Mechanisms Development,” and “Continuous Improvement.” Under “Value Integration Program,” the activities are “Value Framework Development,” “Implementation Strategy,” and “Continuous Reinforcement.” Under “Cultural Reinforcement,” the activities are “Cultural Change Roadmap,” “Recognition Systems,” and “Knowledge Management.” Under “Strategic Vision and Communication,” the activities are “Vision Development and Articulation,” “Stakeholder Management,” “Business Case Development,” and “Change Narrative Creation.” Under “Organizational Competencies Assessment,” the activities are “Current State Analysis,” “Future State Requirements,” and “Gap Analysis.” Under “Well-being and Support Structure,” the activities are “Change Impact Management” and “Support Systems Development.” Under “Resource Allocation,” the activities are “Resource Planning” and “Capacity Management.” Under “Training and Development,” the activities are “Training Needs Analysis,” “Training Program Design,” and “Effectiveness Monitoring.” Under “Technological Adoption,” the activities are “User Needs Analysis,” “Technology Fit Evaluation,” “Risk Assessment,” and “User Satisfaction Metrics.” Under “Employee Involvement and Empowerment,” the activities are “Engagement Framework Development” and “Change Champion Network.”

Human-centric digital transformation customised organisational change management framework. Source: Authors’ own work

Figure 8
A circular diagram with four concentric circles shows phases, categories, and activities of a change management framework.The diagram shows four concentric circles with the inner small circle labeled “Transformation.” The second circle outer to the innermost is divided into three sections labeled from top and moving clockwise as “Sustainable Integration Phase,” “Strategic Initiation Phase,” and “Operational Transformation Phase.” The third circle subdivides each of these into smaller sections. Under “Sustainable Integration Phase,” the sections are “Performance Monitoring and Feedback,” “Value Integration Program,” and “Cultural Reinforcement.” Under “Strategic Initiation Phase,” the sections are “Strategic Vision and Communication,” “Organizational Competencies Assessment,” and “Well-being & Support Structure.” Under “Operational Transformation Phase,” the sections are “Resource Allocation,” “Training and Development,” “Technological Adoption,” and “Employee Involvement and Empowerment.” The fourth and outermost circle lists specific activities for each subsection. Under “Performance Monitoring and Feedback,” the activities are “Measurement Framework Development,” “Monitoring Systems Implementation,” “Feedback Mechanisms Development,” and “Continuous Improvement.” Under “Value Integration Program,” the activities are “Value Framework Development,” “Implementation Strategy,” and “Continuous Reinforcement.” Under “Cultural Reinforcement,” the activities are “Cultural Change Roadmap,” “Recognition Systems,” and “Knowledge Management.” Under “Strategic Vision and Communication,” the activities are “Vision Development and Articulation,” “Stakeholder Management,” “Business Case Development,” and “Change Narrative Creation.” Under “Organizational Competencies Assessment,” the activities are “Current State Analysis,” “Future State Requirements,” and “Gap Analysis.” Under “Well-being and Support Structure,” the activities are “Change Impact Management” and “Support Systems Development.” Under “Resource Allocation,” the activities are “Resource Planning” and “Capacity Management.” Under “Training and Development,” the activities are “Training Needs Analysis,” “Training Program Design,” and “Effectiveness Monitoring.” Under “Technological Adoption,” the activities are “User Needs Analysis,” “Technology Fit Evaluation,” “Risk Assessment,” and “User Satisfaction Metrics.” Under “Employee Involvement and Empowerment,” the activities are “Engagement Framework Development” and “Change Champion Network.”

Human-centric digital transformation customised organisational change management framework. Source: Authors’ own work

Close modal

The framework provides a structured approach to implementing digital transformation while keeping people at the centre of change. It is organised into three sequential phases, Strategic Initialisation Phase, Operational Transformation Phase and Sustainable Integration Phase, each building upon the previous one to ensure comprehensive and sustainable transformation.

The framework includes the following components:

  1. Strategic vision and communication: Clear articulation of the change vision is essential. Aligning technological advancements with organisational values and human-centred principles ensures stakeholder buy-in, reducing resistance and promoting collaboration throughout the organisation.

  2. Organisational Competencies Assessment: A comprehensive assessment of the existing skills, capabilities, and resources within the organisation is critical to ensuring they align with strategic digital transformation goals. This includes identifying areas of strength and recognising where further development is required. A continuous improvement process must be embedded in the organisation’s culture, with regular competency reviews and updates to ensure alignment with evolving technological and market demands

  3. Well-being and support structures: Recognising the stress associated with change, the framework incorporates support structures to maintain employee well-being and productivity during transitions.

  4. Resource allocation: Ensuring that sufficient resources, both financial and human, are allocated effectively to support change initiatives is crucial. This guarantees that logistical constraints do not impede the change process, and that the necessary infrastructure is in place for success.

  5. Comprehensive training and development: Given the central role of training (CHA_13) in the network analysis results, equipping employees with the skills required for the digital era. Beyond technical training, personal development in adaptability, problem-solving capabilities, and emotional intelligence ensures that employees are both capable and willing to embrace change.

  6. Technological adoption: The selection and implementation of technologies must prioritise human empowerment. Technologies should augment rather than replace human capabilities, and their selection should involve a participatory approach, ensuring that employee needs are met and work processes are improved.

  7. Employee involvement and empowerment: Fostering an inclusive atmosphere where employees feel valued and actively involved in the change processes helps mitigate the risk of disengagement, which often results from top-down approaches. Integrating employee participation strengthens the innovative potential of the workforce.

  8. Performance monitoring and feedback: Establishing mechanisms for feedback and performance tracking ensures continuous improvement. Real-time data should inform adjustments to change strategies, enhancing the likelihood of success.

  9. Value integration programs: Embedding shared human-centric values into organisational operations ensures that these values are upheld across all business processes. This fostered a work environment where employees feel valued, leading to enhanced employee loyalty and improved corporate reputation.

  10. Cultural reinforcement: Embedding changes within the organisational culture is essential for their sustainability. Recognising successes and contributions reinforces desired behaviours and helps solidify the new practices.

This framework is not static; it is adaptable and designed to evolve as new insights emerge from theoretical advances and practical applications. Recent studies have demonstrated that successful digital transformation frameworks must balance standardisation with flexibility (Li et al., 2022; Zhang et al., 2023). The framework also demonstrates scalability through its modular implementation structure. Organisations can implement components progressively based on their readiness and resources. The framework’s modular design enables adaptation across different project sizes (small firms focusing on high-centrality elements first), cultural contexts (principle-based implementation allowing local variations), and technological maturity levels (multiple entry points for organisations at different digital development stages).

The framework’s validity is established through its systematic development methodology and evidence-based foundation. All components represent change management activities and human-centric principles already validated in the reviewed literature, ensuring practical applicability. The network analysis provides novel prioritisation of these proven practices rather than introducing untested concepts. Future research phases will include empirical validation through organisational case studies to test implementation effectiveness.

The centrality analysis reveals practical guidance for construction organizations implementing digital transformation. High-centrality nodes represent multiplicative investment opportunities where focused attention yields disproportionate returns across the entire change management system. Training (CHA_13), with its high centrality, should receive priority resource allocation because it simultaneously supports multiple human-centric principles, including Human Capabilities (HCP_1), Knowledge Management (HCP_16), and Work Environment (HCP_3).

Organisations should interpret centrality measures as risk and opportunity indicators; failure to adequately address high-centrality elements creates systemic vulnerabilities that can undermine the entire transformation effort, while success in these areas creates positive momentum that facilitates implementation of other framework components. This network-based prioritisation approach enables organisations to achieve maximum transformation impact with optimal resource utilisation.

Construction organisations can operationalise this framework through several concrete steps: (1) Establish dedicated training programs as the primary investment focus, given Training’s (CHA_13) high centrality and multiplicative effects; (2) Create clear development pathways for employees, aligning with Development Path’s (HCP_14) central role in supporting multiple human-centric principles; (3) Conduct comprehensive organisational competency assessments (CHA_4) before digital technology implementation to identify capability gaps; and (4)Allocate proportionally higher resources to high-centrality activities while maintaining coverage of supporting elements.

For construction managers, this means prioritising workforce development before technology deployment to reduce project disruption risks. Contractors can use this prioritisation to allocate limited budgets more effectively, investing in training programs that enable multiple subsequent digital initiatives rather than scattered technology purchases. Policy-makers can target industry support programs at these high-centrality elements to achieve maximum industry-wide digital transformation impact.

Organisations should adopt a phased approach, beginning with high-centrality elements in Phase 1 (Strategic Initialisation), integrating medium-centrality elements in Phase 2 (Operational Transformation), and consolidating all components in Phase 3 (Sustainable Integration) as outlined in the proposed framework.

While this study provides the foundational prioritisation framework, future research will investigate specific implementation challenges, develop detailed implementation strategies, and examine contextual factors that may influence framework adaptation across different organisational sizes and project types. Subsequent studies will also identify potential barriers to high-centrality element implementation and provide evidence-based solutions for overcoming these challenges in construction industry contexts.

This study acknowledges several limitations. First, reliance on secondary data from published literature means the framework is constrained by the scope and quality of existing research.

Second, the network analysis reflects relationships as identified in the literature rather than empirically validated connections in real organisational contexts. While this approach ensures comprehensive theoretical grounding, future studies should validate these relationships through direct organisational observation.

Regarding generalisability, the framework was developed specifically for the construction industry’s unique characteristics, including project-based work structures, multi-stakeholder environments, and complex technology integration requirements. While core change management principles may be applicable across industries, the specific prioritisation and human-centric focus reflect construction industry contexts. Future research should examine the framework’s adaptability to other industries with different organisational structures and digital transformation requirements.

This research addresses a significant gap in the journey beyond BIM by recognising that successful digital transformation in construction depends not just on technological solutions but on human-centred change management. While BIM and other digital technologies offer tremendous potential for improving efficiency and collaboration in construction, their adoption has been hindered by insufficient attention to the human dimensions of change. The framework developed in this study provides a structured approach for organisations seeking to move beyond current BIM implementation barriers by integrating human-centric principles with technological advancement. By emphasising the framework’s elements, it offers a pathway to address the human factors that have limited the transformative impact of BIM in the AECO industry.

Findings from two systematic literature reviews and advanced network analysis reveal significant interconnectedness between change management activities and human-centric principles. These insights informed the development of a comprehensive change management framework that prioritises strategic vision and communication, robust training programs, efficient resource allocation, and enhanced employee involvement and empowerment. The framework also includes a performance monitoring system and feedback mechanisms, as well as well-designed support systems to ensure employee well-being, thereby ensuring that technological changes do not overshadow human factors.

The proposed framework is distinct because it emphasises the most influential change management activities and human-centred principles while addressing the less prominent yet crucial factors, thereby providing a well-rounded approach. This balance is key to increasing the adaptability and resilience of construction organisations, empowering them to manage digital transformation effectively.

The theoretical contributions of this study lie in its focus on integrating human-centric values into digital change management, an area previously underexplored in the construction sector. In practical terms, the framework offers actionable insights for industry professionals. Furthermore, the model’s inherent flexibility suggests potential applicability beyond the construction industry, offering value to sectors facing similar transformational challenges. This broader applicability highlights the framework’s relevance and utility in a variety of organisational contexts.

In conclusion, this research marks a significant step in reshaping change management practices in the digital era, specifically within construction management. It provides construction managers, contractors, and policymakers with evidence-based guidance for digital transformation that addresses documented industry barriers. The framework’s prioritization approach enables more effective resource allocation and risk reduction in technology implementation, directly supporting industry-wide digitalization efforts. The proposed framework effectively blends technology-driven change with human-centric values, promoting organisational success and employee satisfaction. Future research directions include: (1) empirical validation through case studies with construction organisations of varying sizes, (2) integration strategies with existing project management and BIM systems, (3) development of implementation tools and assessment metrics, (4) adaptation and testing in related project-based industries such as engineering consultancy and infrastructure development, and (5) investigation of cultural and regional factors affecting framework implementation. Continued empirical validation and iterative refinement through both industry application and scholarly review will enhance its robustness and practical applicability.

A.1 NVivo content analysis procedure

The content analysis was conducted using NVivo Qualitative Data Analysis software (Version 12), specifically utilising its auto code feature to extract human-centric principles. NVivo employs a language pack to analyse materials, identifying themes by analysing content and sentence structure. The software assigns significance to themes based on their frequency within the analysed material. These themes are then grouped, and results are presented as nodes representing broad ideas, with child nodes representing individual themes within each group.

A.2 Python implementation for network analysis

The network analysis was implemented using Python 3.8 with the following libraries:

  1. NetworkX (version 2.6) for graph-based calculations and centrality measures

  2. pandas (version 1.3.0) for data manipulation and matrix operations

  3. matplotlib (version 3.4.2) for network visualization

A.3 Centrality calculation details

Normalised degree centrality C'D(v) for a node “v” was obtained using the formula:

Where max_{u ∈ V} CD(u) is the maximum degree centrality observed in the network.

A.4 Visualisation parameters

Visual encoding was defined by the mapping: colour(v) = ColourMap(CD'(v)), where ColourMap is a function that maps the normalized centrality measure to a colour gradient. Node sizes were set proportional to centrality values using the formula: size(v) = base_size × (1 + scaling_factor × CD'(v)).

This paper forms part of a special section “Beyond BIM – Navigating the Transformative Journey of the AECO Industry”, guest edited by Mehran Oraee, M. Reza Hosseini and Farzad Rahimian.

Al-Haddad
,
S.
and
Kotnour
,
T.
(
2015
), “
Integrating the organizational change literature: a model for successful change
”,
Journal of Organizational Change Management
, Vol. 
28
No. 
2
, pp. 
234
-
262
, doi: .
Ali
,
M.A.
,
Zafar
,
U.
,
Mahmood
,
A.
and
Nazim
,
M.
(
2021
), “
The power of adkar change model in innovative
”,
LogForum
, Vol. 
17
No. 
4
, pp.
485
-
502
.
Al-ohali
,
Y.
,
Alhojailan
,
M.
and
Palavitsinis
,
N.
(
n.d
),
Human Factors in Digital Transformation of Education: Lessons Learned from the Future Gate at Saudi K-12
,
Springer International Publishing
, doi: .
Alban
,
B.
(
1987
), “
Organizational transitions: managing complex change (second edition)
”,
Academy of Management Perspectives
, Vol. 
1
No. 
2
, pp. 
150
-
151
, doi: .
Anthony Mento
,
R.J.
and
Dirndorfer
,
W.
(
2002
), “
A change management process: grounded in both theory and practice
”,
Journal of Change Management
, Vol. 
3
No. 
1
, pp. 
45
-
59
, doi: .
Beckhard
,
R.
(
1987
),
Organizational Transitions: Managing Complex Change
,
Addison-Wesley
,
Boston, MA
.
Bellantuono
,
N.
,
Nuzzi
,
A.
,
Pontrandolfo
,
P.
and
Scozzi
,
B.
(
2021
), “
Digital transformation models for the i4.0 transition: lessons from the change management literature
”,
Sustainability
, Vol. 
13
No. 
23
, p.
12941
, doi: .
Bidhendi
,
A.
and
Poshdar
,
M.
(
2024
), “
Empowering construction, a review approach: a human-centric approach to industry 5.0 and its organisational benefits
”,
Joint Safety, Health, and Well-Being in Construction (W099) and People in Construction (W123) International Conference
, pp. 
282
-
293
.
Boontae
,
N.
and
Ussavadilokrit
,
M.
(
2024
), “
Challenges in implementing building information modelling for facility management in government buildings in Thailand
”,
Property Management
, Vol. 
42
No. 
3
, pp. 
431
-
453
, doi: .
Bradu
,
P.
,
Biswas
,
A.
,
Nair
,
C.
,
Sreevalsakumar
,
S.
,
Patil
,
M.
,
Kannampuzha
,
S.
,
Mukherjee
,
A.G.
,
Wanjari
,
U.R.
,
Renu
,
K.
,
Vellingiri
,
B.
and
Gopalakrishnan
,
A.V.
(
2022
), “
Recent advances in green technology and industrial revolution 4.0 for a sustainable future
”,
Environmental Science and Pollution Research
, Vol. 
30
No. 
60
, pp. 
124488
-
124519
, doi: .
Brisson-Banks
,
C.V.
(
2010
), “
Managing change and transitions: a comparison of different models and their commonalities
”,
Library Management
, Vol. 
31
No. 
4
, pp. 
241
-
252
, doi: .
Bugubayeva
,
R.O.
,
Sansyzbayevna
,
R.B.
and
Teczke
,
M.
(
2017
), “
Approaches and models for change management
”,
Jagiellonian Journal of Management
, Vol. 
3
No. 
3
, pp. 
195
-
208
, doi: .
Bullock
,
J.
and
Batten
,
D.
(
1985
),
Going Through
, Vol. 
10
No. 
4
, pp. 
383
-
412
, doi: .
Burnes
,
B.
(
2004
), “
Kurt lewin and the planned approach to change: a re-appraisal
”,
Journal of Management Studies
, Vol. 
41
No. 
6
, pp. 
977
-
1002
, doi: .
Carnicero
,
I.
,
Gonz
,
C.
and
Rosales
,
V.F.
(
2021
), “
The transformation process of the university into a data driven organisation and advantages it brings : qualitative case study
”,
Sustainability
, Vol. 
13
No. 
22
, p.
12611
, doi: .
Chowdhury
,
M.
,
Hosseini
,
M.R.
,
Edwards
,
D.J.
,
Martek
,
I.
and
Shuchi
,
S.
(
2024
), “
Comprehensive analysis of BIM adoption: from narrow focus to holistic understanding
”,
Automation in Construction
, Vol. 
160
, 105301, doi: .
Chuang
,
T.-Y.
and
Yang
,
M.-J.
(
2023
), “
Change component identification of BIM models for facility management based on time-variant BIMs or point clouds
”,
Automation in Construction
, Vol. 
147
, 104731, doi: .
Davila Delgado
,
J.M.
,
Oyedele
,
L.
,
Ajayi
,
A.
,
Akanbi
,
L.
,
Akinade
,
O.
,
Bilal
,
M.
and
Owolabi
,
H.
(
2019
), “
Robotics and automated systems in construction: understanding industry-specific challenges for adoption
”,
Journal of Building Engineering
, Vol. 
26
, 100868, doi: .
Elsayegh
,
A.
and
El-adaway
,
I.H.
(
2021
), “
Collaborative planning index: a novel comprehensive benchmark for collaboration in construction projects
”,
Journal of Management in Engineering
, Vol. 
37
No. 
5
, 4021057, doi: .
Etareri
,
L.
(
2022
), “
An analysis framework of change management
”,
Medicon Engineering Themes
, Vol. 
3
No. 
1
, pp. 
30
-
38
, doi: .
Etareri
,
L.
,
Review
,
L.
and
Review
,
L.
(
2022
), “
An analysis framework of change management
”,
Medicon Engineering Themes
, Vol. 
3
No. 
1
, pp. 
30
-
38
, doi: .
Fortune Business Insights
(
2024
), “
Building information modelling software market size, share & industry analysis
”,
available at:
 https://www.fortunebusinessinsights.com/building-information-modelling-software-market-102986
Frost
,
M.
,
Jeske
,
T.
and
Ottersb
,
N.
(
2020
), “
Leadership and corporate culture as key factors for thriving digital change
”,
Advances in Intelligent Systems and Computing
, Vol. 
1207
, pp.
55
-
61
, doi: .
Galli
,
B.J.
(
2018
), “
Change management models: a comparative analysis and concerns
”,
IEEE Engineering Management Review
, Vol. 
46
No. 
3
, pp. 
124
-
132
, doi: .
Ghobakhloo
,
M.
,
Mahdiraji
,
H.A.
and
Iranmanesh
,
M.
(
2024
),
From Industry 4.0 Digital Manufacturing to Industry 5.0 Digital Society: A Roadmap Toward Human-Centric, Sustainable, and Resilient Production, Information Systems Frontiers
,
Springer US
.
Global Growth Insights
(
2024
), “
Building information modelling market size, trends, growth analysis report 2033
”,
available at:
 https://www.globalgrowthinsights.com/market-reports/building-information-modelling-market-105605
Hosseini
,
M.R.
,
Maghrebi
,
M.
,
Akbarnezhad
,
A.
,
Martek
,
I.
and
Arashpour
,
M.
(
2018
), “
Analysis of citation networks in building information modeling research
”,
Journal of Construction Engineering and Management
, Vol. 
144
No. 
8
, 4018064, doi: .
Huang
,
T.-W.
,
Chen
,
Y.H.
,
Lin
,
J.J.
and
Chen
,
C.S.
(
2025
), “
Deep learning without human labeling for on-site rebar instance segmentation using synthetic BIM data and domain adaptation
”,
Automation in Construction
, Vol. 
171
, 105953, doi: .
İkinci
,
S.S.
(
2014
), “
Organizational change: importance of leadership style and training
”,
Management and Organizational Studies
, Vol. 
1
No. 
2
, pp. 
122
-
128
, doi: .
Iskandar
,
A.
,
Saon
,
S.
and
Chandra
,
I.
(
2020
), “
Change management to support institutional amendment of higher education based on Kotter’s model
”, in
SIET ’20: Proceedings of the 5th International Conference on Sustainable Information Engineering and Technology
, pp.
244
-
249
, doi: .
Jafari
,
P.
,
Mohamed
,
E.
,
Lee
,
S.
and
Abourizk
,
S.
(
2020
), “
Social network analysis of change management processes for communication assessment
”,
Automation in Construction
, Vol. 
118
, 103292, doi: .
Jonas
,
K.
and
Mainka
,
A.
(
2022
), “
Implementing an agile change process to improve digital transformation in higher education teaching
”,
Lecture Notes in Business Information Processing
, Vol. 
1
, pp. 
80
-
93
, doi: .
Joseph
,
N.
(
2020
),
Analysing ERP Implementations from Organizational Change Perspective : an Exploratory Study
,
Springer International Publishing
, doi: .
Juneja
,
P.
(
2020
), “
Kurt Lewin’s change management model: the planned approach to organizational change
”,
ManagementStudyGuide. Com, available at:
 https://www.managementstudyguide.com/kurt
Kabashkin
,
I.
,
Yatskiv
,
I.
and
Prentkovskis
,
O.
 
(Eds)
(
2023
),
Effective Change Management and Continues Improvements on Smart Governments
,
Springer International Publishing
, doi: .
Kickert
,
W.J.M.
(
2014
), “
Specificity of change management in public organizations: conditions for successful organizational change in Dutch ministerial departments
”,
The American Review of Public Administration
, Vol. 
44
No. 
6
, pp. 
693
-
717
, doi: .
Kordestani Ghalenoei
,
N.
,
Babaeian Jelodar
,
M.
,
Paes
,
D.
and
Sutrisna
,
M.
(
2024
), “
Challenges of offsite construction and BIM implementation: providing a framework for integration in New Zealand
”,
Smart and Sustainable Built Environment
, Vol. 
13
No. 
4
, pp. 
780
-
808
, doi: .
Kotter
,
J.P.
(
1995
), “
Leading change: why transformation efforts fail
”,
Harvard Business Review
, Vol. 
73
, pp.
59
-
67
.
Lat
,
D.C.
,
Noor
,
SNAM
,
Rahman
,
N.S.A.
and
Razali
,
R.
(
2021
), “
Construction industry towards IR 4.0-A review
”,
AIP Conference Proceedings
, Vol. 
2339
No. 
1
, 20084, doi: .
Li
,
H.
,
Ma
,
W.
,
Wang
,
H.
,
Liu
,
G.
,
Wen
,
X.
,
Zhang
,
Y.
,
Yang
,
M.
,
Luo
,
G.
,
Xie
,
G.
and
Sun
,
C.
(
2022
), “
A framework and method for human-robot cooperative safe control based on digital twin
”,
Advanced Engineering Informatics
, Vol. 
53
, 101701, doi: .
Li
,
J.
,
Chen
,
Y.
and
Wang
,
H.
(
2025
), “
Human–machine system modeling and safety risk assessment in construction operations incorporating workers’ performance variability
”,
Journal of Construction Engineering and Management
, Vol. 
151
No. 
3
, 4024209, doi: .
Liu
,
Y.
,
Alias
,
A.H.B.
,
Haron
,
N.A.
,
Bakar
,
N.A.
and
Wang
,
H.
(
2024
), “
Exploring three pillars of construction robotics via dual-track quantitative analysis
”,
Automation in Construction
, Vol. 
162
, 105391, doi: .
Lugonja
,
D.
(
2020
), “
Change management as a support to the organizations’ digital transformation-state of the art
”,
Proceedings ot the 31st Central European Conference on Information and Intelligent Systems (CECIIS)
, pp. 
167
-
174
,
available at:
 https://www.proquest.com/conference-papers-proceedings/change-management-as-support-organizations/docview/2531368479/se-2
Maskuriy
,
R.
,
Selamat
,
A.
,
Maresova
,
P.
,
Krejcar
,
O.
and
David
,
O.O.
(
2019
), “
Industry 4.0 for the construction industry: review of management perspective
”,
Economies
, Vol. 
7
No. 
3
, pp. 
1
-
14
, doi: .
Melnikovas
,
A.
(
2018
), “
Towards an explicit research methodology: adapting research onion model for futures studies
”,
Journal of Futures Studies
, Vol. 
23
No. 
2
, pp. 
29
-
44
, doi: .
Mento
,
A.
,
Jones
,
R.
and
Dirndorfer
,
W.
(
2002
), “
A change management process: grounded in both theory and practice
”,
Journal of Change Management
, Vol. 
3
No. 
1
, pp. 
45
-
59
, doi: .
Miller
,
J.L.
(
2017
),
Managing Managing Transitions: Using William Bridges’ Transition Model and a Change Style Assessment Instrument to Inform Strategies and Measure Progress in Organizational Change Management Using William Bridges_ Transition Model and
,
Butler University
, pp. 
357
-
364
,
available at:
 https://digitalcommons.butler.edu/librarian_papers/74/
Mishra
,
A.
,
Hasan
,
A.
and
Jha
,
K.N.
(
2024
), “
A holistic evaluation of BIM implementation barriers in the Indian construction industry: pre- and post-adoption perspectives
”,
International Journal of Construction Education and Research
, Vol. 
20
No. 
3
, pp. 
358
-
380
, doi: .
Moradi
,
S.
and
Sormunen
,
P.
(
2024
), “
Integrating lean construction with BIM and sustainability: a comparative study of challenges, enablers, techniques, and benefits
”,
Construction Innovation
, Vol. 
24
No. 
7
, pp. 
188
-
203
, doi: .
Munir
,
M.
,
Kiviniemi
,
A.
,
Jones
,
S.
and
Finnegan
,
S.
(
2021
), “
BIM business value for asset owners: key issues and challenges
”,
International Journal of Building Pathology and Adaptation
, Vol. 
39
No. 
1
, pp. 
135
-
151
, doi: .
Nowotarski
,
P.
and
Paslawski
,
J.
(
2017
), “
Industry 4.0 concept introduction into construction SMEs
”,
IOP Conference Series: Materials Science and Engineering
, Vol. 
245
No. 
5
, p.
10
, doi: .
Pacolli
,
M.
(
2022
), “
Importance of change management in digital transformation sustainability
”,
IFAC-PapersOnLine
, Vol. 
55
No. 
39
, pp. 
276
-
280
, doi: .
Petersson
,
L.
,
Larsson
,
I.
,
Nygren
,
J.M.
,
Nilsen
,
P.
,
Neher
,
M.
,
Reed
,
J.E.
,
Tyskbo
,
D.
and
Svedberg
,
P.
(
2022
), “
Challenges to implementing artificial intelligence in healthcare : a qualitative interview study with healthcare leaders in Sweden
”,
BMC Health Services Research
, Vol. 
8
, pp. 
1
-
16
, doi: .
Qureshi
,
A.M.
(
2024
), “
The use of sensors in complement to industry 4.0 technologies to optimize production operations an analysis of the industry technologies and model for their relations with optimized production
”,
Interantional Journal of Scientific Research in Engineering and Management
, Vol. 
08
No. 
3
, pp. 
1
-
5
, doi: .
Radzi
,
A.R.
,
Azmi
,
N.F.
,
Kamaruzzaman
,
S.N.
,
Algahtany
,
M.
and
Rahman
,
R.A.
(
2025
), “
Challenges in construction readiness for BIM-Based building projects
”,
Journal of Asian Architecture and Building Engineering
, Vol. 
24
No. 
3
, pp. 
1689
-
1704
, doi: .
Raineri
,
A.B.
(
2011
), “
Change management practices: impact on perceived change results
”,
Journal of Business Research
, Vol. 
64
No. 
3
, pp. 
266
-
272
, doi: .
Ramiah
,
K.
and
Moore
,
A.F.
(
2023
), “
DRA global : implementing digital transformation through change management in a project consultancy fi rm
”,
Emerald Emerging Markets Case Studies
, Vol. 
13
No. 
4
, pp. 
1
-
14
, doi: .
Robertson
,
A.
and
De Vellis
,
L.
(
2023
), “Digitally transforming EPC brownfield project execution with AWP: applying the ADKAR change management model for scalability and improved uptake”, in
Society of Petroleum Engineers - ADIPEC, ADIP 2023. Petrofac, Aberdeen
,
Society of Petroleum Engineers
, doi: .
Shaharruddin
,
S.
and
Musa
,
M.M.
(
2022
), “
A future Malaysian banking landscape in embracing IR4. 0: a new leadership model
”, Vol. 
3
No. 
3
, pp. 
264
-
271
.
Sheikhkhoshkar
,
M.
,
Bril El-Haouzi
,
H.
,
Aubry
,
A.
and
Hamzeh
,
F.
(
2023
), “
Functionality as a key concept for integrated project planning and scheduling methods
”,
Journal of Construction Engineering and Management
, Vol. 
149
No. 
7
, 4023053, doi: .
Singh
,
R.
,
Goel
,
G.
and
Ghosh
,
P.
(
2022
), “
People-centric interventions in change implementation: an analysis of change models
”,
Organization Development Journal
, Vol. 
40
No. 
3
, pp. 
8
-
21
.
Smith
,
R.
,
King
,
D.
,
Sidhu
,
R.
and
Skelsey
,
D.
(
2014
),
The Effective Change Manager’s Handbook: Essential Guidance to the Change Management Body of Knowledge
,
Kogan Page Publishers
.
Soman
,
R.K.
,
Farghaly
,
K.
,
Mills
,
G.
and
Whyte
,
J.
(
2025
), “
Digital twin construction with a focus on human twin interfaces
”,
Automation in Construction
, Vol. 
170
, 105924, doi: .
Sung
,
W.
and
Kim
,
C.
(
2021
), “
A study on the effect of change management on organizational innovation: focusing on the mediating effect of members’ innovative behavior
”,
Sustainability
, Vol. 
13
No. 
4
, pp. 
1
-
26
, doi: .
Timchuk
,
O.G.
,
Nikityuk
,
L.G.
and
Bakhtairova
,
E.A.
(
2021
), “
Integration of innovations in the construction industry
”,
IOP Conference Series: Earth and Environmental Science
, Vol. 
751
No. 
1
, p.
012181
, doi: .
Townsend
,
M.
and
Romme
,
A.G.L.
(
2024
), “
The emerging concept of the human-centered organization : a review and synthesis of the literature
”,
Humanistic Management Journal
, Vol. 
9
No. 
1
, pp. 
53
-
74
, doi: .
Turek
,
W.
,
Cetnarowicz
,
K.
and
Borkowski
,
A.
(
2017
), “
On human-centric and robot-centric perspective of a building model ☆
”,
Automation in Construction
, Vol. 
81
 
May
, pp. 
2
-
16
, doi: .
Veling
,
L.
(
2014
), “
Human-centred design for digital transformation
”,
White Paper Series
, pp. 
1
-
8
,
available at:
 http://mural.maynoothuniversity.ie/6378/
Wang
,
Y.
,
Thangasamy
,
V.K.
,
Hou
,
Z.
,
Tiong
,
R.L.
and
Zhang
,
L.
(
2020
), “
Collaborative relationship discovery in BIM project delivery: a social network analysis approach
”,
Automation in Construction
, Vol. 
114
, 103147, doi: .
Wang
,
Z.
,
González
,
V.A.
,
Mei
,
Q.
and
Lee
,
G.
(
2025
), “
Sensor adoption in the construction industry: barriers, opportunities, and strategies
”,
Automation in Construction
, Vol. 
170
, 105937, doi: .
Wernicke
,
B.
,
Stehn
,
L.
,
Sezer
,
A.A.
and
Thunberg
,
M.
(
2023
), “
Introduction of a digital maturity assessment framework for construction site operations
”,
International Journal of Construction Management
, Vol. 
23
No. 
5
, pp. 
898
-
908
, doi: .
Wincek
,
J.
,
Myers
,
M.R.
and
Ozog
,
H.
(
2013
), “
Organizational change management
”,
28th Center for Chemical Process Safety International Conference 2013, CCPS - Topical Conference at the 2013 AIChE Spring Meeting and 9th Global Congress on Process Safety
, Vol. 
2
No. 
1
, pp. 
876
-
886
, doi: .
Zhang
,
M.
,
Xu
,
R.
,
Wu
,
H.
,
Pan
,
J.
and
Luo
,
X.
(
2023
), “
Human–robot collaboration for on-site construction
”,
Automation in Construction
, Vol. 
150
, 104812, doi: .
Zizic
,
M.C.
,
Mladineo
,
M.
,
Gjeldum
,
N.
and
Celent
,
L.
(
2022
), “
Of paradigm shift for the people, organization and technology
”,
Energies
, Vol. 
15
No. 
14
, p.
5221
, doi: .
Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at Link to the terms of the CC BY 4.0 licence.

or Create an Account

Close Modal
Close Modal