Skip to Main Content
Article navigation

While many procurement systems govern the construction sector, Design/Bid/Build is still prominent among the French building actors. The research applies Lean thinking (via a kaizen event) to the bidding phase of a building construction company to improve its bidding outputs.

The method used in this study is “Action-Research”. A two-month preparation phase was needed to prepare for the kaizen event. The results were based on an assessment conducted after 6 months of the kaizen event. Performance was measured following selected indicators related to ‘Time’, “Economical Impact”, “Quality” and “Sustainability”.

The Lean implementation had positive side-effects on the company’s organization and strategy as well.

The findings of this action-research project can be used to help researchers and practitioners assess the potential application of Lean in the bidding phase. It also provides insights into the importance of the cultural and existing practices for a successful Lean implementation.

A few research projects investigated the application of Lean thinking in bidding as it is considered as a wasteful process. However, waste can also be organized. The research proves that bidding can benefit from Lean thinking.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal