States that the time taken to deliver a product to the market determines a company’s success, and that research has shown that a delay of six months leads to 33 per cent of its potential profit being lost. Explores the existing method of assessing new product reliability, namely reliability demonstrating testing, and presents its numerous shortcomings and deficiencies. Analyses the results of performing reliability demonstration testing on eight products which support the viewpoint that it is no longer appropriate. Proposes a SURGE (stress unveiled reliability growth enhancement) process, leading to significant saving in development time and thereby time‐to‐market while providing a more reliable product and process. Places emphasis on the control of all of the development processes, design, manufacturing, and materials procurement and producing prototype units via the intended volume process. Performs monitoring by appropriate stress testing designed to precipitate all potential defects and involves testing beyond design specification. By correcting defects on the product, and ultimately on the processes which produced them, develops more reliable products. Concludes that the results of the SURGE process have led to a reduction in development times of 14 per cent while also reducing the time taken to ramp up to full volume production by 50 per cent.
Article navigation
1 November 1997
Research Article|
November 01 1997
SURGE process ‐ a time‐to‐market approach to reliability improvement
John Donovan;
John Donovan
Regional Technical College, Sligo, Ireland
Search for other works by this author on:
Eamonn Murphy;
Eamonn Murphy
University of Limerick, Ireland
Search for other works by this author on:
M.I. Stephenson
M.I. Stephenson
University of Limerick, Ireland
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6682
Print ISSN: 0265-671X
© MCB UP Limited
1997
International Journal of Quality & Reliability Management (1997) 14 (8): 834–848.
Citation
Donovan J, Murphy E, Stephenson M (1997), "SURGE process ‐ a time‐to‐market approach to reliability improvement". International Journal of Quality & Reliability Management, Vol. 14 No. 8 pp. 834–848, doi: https://doi.org/10.1108/02656719710181376
Download citation file:
New and popular articles
Suggested Reading
The effects of ionizing radiation on the functional and parametric performance of NMOS static RAMs
International Journal of Quality & Reliability Management (March,1997)
An Approach to the Evaluation of Management Training Exercises
Leadership & Organization Development Journal (January,1986)
Cost optimization of accelerated burn‐in
International Journal of Quality & Reliability Management (October,1996)
An alternative to the Weibull step‐stress model
International Journal of Quality & Reliability Management (March,1999)
The product champion tests his vision
World Class Design to Manufacture (October,1995)
Related Chapters
Application of risk and reliability to the management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
USING EN 1990 TO IMPROVE CONSISTENCY OF SAFETY FOR STRUCTURAL BUILDING MATERIALS
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Construct Measurement in Strategic Management Research in Africa
Advancing Research Methodology in the African Context: Techniques, Methods, and Designs
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
