A case study of the analysis of operator reponse times following an abnormal event is presented. A number of timings of operator responses on a full‐scale nuclear plant simulator have been taken. These timings are compared with the human cognitive reliability (HCR) model. Agreement with the basic framework of the model is shown. Based on the data collected and on operators′ judgements on behaviour differences on simulators and the plant, criticisms of some aspects of the model are raised. The principal findings are: (1) the technique relies on the judgement of the analyst in the correct selection of behaviour type. The results of the analysis are very sensitive to this behaviour type; (2) the methods proposed for estimating the median response time are questioned, particularly when applying data from simulator measurements to the plant.
Article navigation
1 May 1990
Research Article|
May 01 1990
A Comparison of Operator Response Times Predicted by the HCR Model with those Obtained from Simulators Available to Purchase
Publisher: Emerald Publishing
Online ISSN: 1758-6682
Print ISSN: 0265-671X
© MCB UP Limited
1990
International Journal of Quality & Reliability Management (1990) 7 (5)
Citation
Dolby A (1990), "A Comparison of Operator Response Times Predicted by the HCR Model with those Obtained from Simulators". International Journal of Quality & Reliability Management, Vol. 7 No. 5 pp. No Pagination Specified, doi: https://doi.org/10.1108/02656719010143889
Download citation file:
Suggested Reading
Human Error Data Collection and Data Generation
International Journal of Quality & Reliability Management (April,1990)
Analysis of computer integrated manufacturing systems by fuzzy human operator behaviour
Journal of Quality in Maintenance Engineering (September,1997)
A Simulation Methodology for Evaluating the Reliability, Availability and Performance of the Next European Torus
International Journal of Quality & Reliability Management (January,1990)
What One Manager Learned in “The Looking Glass” and How He Learned It
Journal of Management Development (April,1986)
Climbing, walking and intervention robots
Industrial Robot (April,1997)
Related Chapters
Application of risk and reliability to the management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
APPLICATION OF RELIABILITY THEORY IN SERVICE LIFE PREDICTION OF INITIATION TIME
Challenges of Concrete Construction: Volume 3, Repair, Rejuvenation and Enhancement of Concrete: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 5–6 September 2002
Construct Measurement in Strategic Management Research in Africa
Advancing Research Methodology in the African Context: Techniques, Methods, and Designs
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
