Presents two sequential preventive maintenance (PM) models. The first model can be viewed as an extension of Nakagawa’s model where the age reduction of the system is assumed to depend on the level of PM activities. Linear and nonlinear relationships between age reduction and PM level have been considered. In the second model, a sequential PM model is developed in which PM intervals are defined such that the integrated hazard rate over each interval is the same for all intervals. This restriction reduces the number of decision variables from N + 2 to only three decision variables, where N is the number of intervals between PMs. The cost difference between these two models was very small for the examples solved. This provides evidence that the integrated hazard rate restriction provides a very good approximation of this sequential PM model. This suggests that the integrated hazard rate condition may be used to reduce greatly the number of decision variables at the expense of a reasonable increase in the expected total cost.
Article navigation
1 August 2000
Research Article|
August 01 2000
On an imperfect preventive maintenance model Available to Purchase
M. Ben‐Daya;
M. Ben‐Daya
King Fahd University of Petroleum and Minerals, Dharan, Saudi Arabia
Search for other works by this author on:
A.S. Alghamdi
A.S. Alghamdi
King Fahd University of Petroleum and Minerals, Dharan, Saudi Arabia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6682
Print ISSN: 0265-671X
© MCB UP Limited
2000
International Journal of Quality & Reliability Management (2000) 17 (6): 661–670.
Citation
Ben‐Daya M, Alghamdi A (2000), "On an imperfect preventive maintenance model". International Journal of Quality & Reliability Management, Vol. 17 No. 6 pp. 661–670, doi: https://doi.org/10.1108/02656710010317065
Download citation file:
Suggested Reading
Multi-objective maintenance planning under preventive maintenance
Journal of Quality in Maintenance Engineering (November,2021)
Age‐based opportunity maintenance
Journal of Quality in Maintenance Engineering (September,1999)
Optimal replacement with minimal repair policy for a system operating over a random time horizon
Journal of Quality in Maintenance Engineering (October,2011)
Pansystems optimization, generalized principles of optimality, and fundamental equations of dynamic programming
Kybernetes (April,1997)
A zero-one integer programming for preventive maintenance scheduling for electricity and distiller plants with production
Journal of Quality in Maintenance Engineering (November,2019)
Related Chapters
Multi-objective optimization in a circumscribed bridge system
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Using process capability analysis and simulation to improve patient flow
Applications of Management Science
Optimizing Resources to Better Forecast Future Profits
Advances in Business and Management Forecasting
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
