Keywords: BPR
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
The TQM Magazine (1998) 10 (6): 438–446.
Published: 01 December 1998
...Frances M. Hill; Lee K. Collins The paper reports some findings generated by a postal survey of Northern Ireland’s top 100 companies. The aims of the survey included: gaining some insight into levels of awareness, understanding and use of business process re‐engineering (BPR) in the province...
Journal Articles
The TQM Magazine (1998) 10 (5): 321–333.
Published: 01 October 1998
... of the term TQM and fallacies about BPR are explained. The overall theme is that improvement is better viewed as a revolutionary process than a revolutionary event. Beware gurus and prescriptive solutions. This whole area of encouraging innovation is a good example of the evolutionary approach of Japanese...
Journal Articles
The TQM Magazine (1998) 10 (5): 342–354.
Published: 01 October 1998
... are used for process modelling within business process reengineering. A survey conducted by DISA (1995), showed that the usual tools for BPR are, functional modelling, data modelling and simulation based. Among these, the data and functional modelling tools were most widely used, whereas tools...
Journal Articles
The TQM Magazine (1998) 10 (3): 177–185.
Published: 01 June 1998
... approach to change in an attempt to become more competitive, flexible and responsive to customer demands. Business process re‐engineering (BPR) has been advocated as an alternative to TQM. While BPR seeks radical performance improvements as an objective, the path that is taken is much more incremental...
Journal Articles
The TQM Magazine (1998) 10 (2): 69–71.
Published: 01 April 1998
... was not clearly defined and the project cycle time which was too long. Concludes that the approach still has a role to play. © MCB UP Limited 1998 BPR Improvement Performance Process management A typical process reengineering project took about 10‐12 months to develop a future‐state solution...
Journal Articles
The TQM Magazine (1997) 9 (1): 54–60.
Published: 01 February 1997
... of the business. This knowledge leads to process re‐engineering, benchmarking, activity‐based budgeting, and many other useful initiatives. In every company there is a need to improve processes, and to keep and attract the right customers. While many change programmes based on TQM and BPR methodologies deliver...
Journal Articles
The TQM Magazine (1996) 8 (6): 58–65.
Published: 01 December 1996
...Mohamed Zairi Presents evidence from a survey conducted in four industrial sectors (health care, public, service and manufacturing), in order to: ascertain the level of understanding, usage and also the degree of effectiveness of the business process re‐engineering (BPR) concept in all the sectors...
Journal Articles
The TQM Magazine (1996) 8 (6): 42–47.
Published: 01 December 1996
.... Business process redesign (BPR) is the radical redesign of business as a whole or individual work processes in order to maximize business effectiveness. It differs from continuous process improvement in that it challenges the need for the current process in the first place. If the process is indeed needed...
Journal Articles
The TQM Magazine (1996) 8 (5): 7–13.
Published: 01 October 1996
...Jack A. Castle Reviews developments in total quality management (TQM), business process re‐engineering (BPR) and world‐class manufacturing (WCM). Using modern systems, service quality and operations management theory, proposes an integrating model for managerial use which unifies existing...
Journal Articles
Journal Articles
The TQM Magazine (1995) 7 (4): 42–56.
Published: 01 August 1995
... this section on productivity improvement in the supplies management function by identifying some potential supply management“productivity drivers” (from [ 13, pp. 200‐05 ]): © MCB UP Limited 1995 Benchmarking BPR Scientific management Strategic management This article reflects...
Journal Articles
The TQM Magazine (1995) 7 (4): 9–12.
Published: 01 August 1995
...,and presents the findings of a postal questionnaire survey concerned with the extent of usage and the nature of the quality initiatives in the financial services sector. © MCB UP Limited 1995 BPR Financial services Quality TQM United Kingdom However, in recent years fundamental changes...
Journal Articles
Journal Articles
The TQM Magazine (1995) 7 (3): 50–53.
Published: 01 June 1995
... of improving business processes. Demonstrates that business process re‐engineering efforts can be driven by shopfloor employees when an appropriate consultative environment is in place and how TQM can assist in this process. Australia BPR Competitive advantage Customer service Management Organizational...
Journal Articles
The TQM Magazine (1995) 7 (1): 42–45.
Published: 01 February 1995
... Limited 1995 BPR Co‐operative Bank Customer service Service quality Teamwork TQM Economic recession in the late 1980s hit hard in the banking and finance industry, resulting, over the same period, in organization takeovers, mergers and the loss of over 100,000 jobs. Banks came under...
Journal Articles
The TQM Magazine (1994) 6 (6): 38–48.
Published: 01 December 1994
...D. Lance Revenaugh Business process re‐engineering (BPR) is a radical rethinking of an organization and its cross‐functional, end‐to‐end processes and has taken corporations by storm. Despite the excitement over BPR, however,the rate of failure for re‐engineering projects is over 50 per cent. Uses...
Journal Articles
The TQM Magazine (1994) 6 (6): 19–22.
Published: 01 December 1994
...David Jackson Examines the latest management fad, business process re‐engineering(BPR). Argues that while little is really new, the need for organizations to embrace process improvement is high. Discusses some key success factors for organizations taking the BPR route. The adoption of outrageous...
Journal Articles
The TQM Magazine (1994) 6 (5): 9–10.
Published: 01 October 1994
... and a genuine willingness to challenge the status quo, rather than starting with the present,“paint” the ideal picture of the future. The task is then to bridge the gap by introducing “stretch” targets and radical thinking. Barriers BPR Creativity Management attitudes Organizational change Senior...
Journal Articles
The TQM Magazine (1994) 6 (4): 29–33.
Published: 01 August 1994
...” lower‐level staff to improve their own work situation, albeit normally in a directed manner. © MCB UP Limited 1994 BPR Improvement Management development Qualifications Quality programmes TQM In reality, every organization adopts a different approach to making steps towards...

or Create an Account

Close Modal
Close Modal