This paper examines the benefit of incorporating a group of employees that exhibit dynamic service rates into scheduling tours in a service operation. The service operation that is examined includes a fully productive core (full‐time) workforce along with a contingent (full‐ and part‐time) workforce that experiences the learning effect. Two methods that account for the learning effect are analyzed along with two methods that do not consider learning effects. The schedules generated by each method are tested in a simulation of the service environment. The results of a full‐factorial experiment indicate that methods that account for learning effects will yield superior solutions over a variety of operating conditions when compared to alternative methods that do not consider learning effects. The performance improvement of schedules generated with the most precise learning curve method was substantially and significantly better than the other methods. The conditions in which the learning curve methods provide the most benefit are explored.
Article navigation
1 August 1998
This article was originally published in
International Journal of Service Industry Management
Research Article|
August 01 1998
Tour scheduling with dynamic service rates
John C. Goodale;
John C. Goodale
Department of Management, Ball State University, Muncie, USA
Search for other works by this author on:
Enar Tunc
Enar Tunc
Department of Management, Ball State University, Muncie, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6704
Print ISSN: 0956-4233
© MCB UP Limited
1998
International Journal of Service Industry Management (1998) 9 (3): 226–247.
Citation
Goodale JC, Tunc E (1998), "Tour scheduling with dynamic service rates". International Journal of Service Industry Management, Vol. 9 No. 3 pp. 226–247, doi: https://doi.org/10.1108/09564239810223538
Download citation file:
3,799
Views
New and popular articles
Suggested Reading
A microcomputer cashier scheduling system for supermarket stores
International Journal of Physical Distribution & Logistics Management (February,1995)
Work strategy, markets and knowledge
The Antidote (December,1998)
Dynamic scheduling of flexible manufacturing systems using neural networks and inductive learning
Integrated Manufacturing Systems (March,2003)
Collaborative Care Planning: A Team Approach to Care
Int J Health Care Qual Assur (February,1992)
Team charter
The TQM Magazine (October,1998)
Related Chapters
A multiple objective approach to assigning classes for an executive MBA program
Applications of Management Science
A Machine Learning–Based Buffer Estimation for Construction Schedules Under Uncertainty
The Role of Artificial Intelligence Applications in Business
Chinese Tourists and the Sun: Implications for Designing Experiences
Delivering Tourism Intelligence: From Analysis to Action
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
